中国安全科学学报 ›› 2024, Vol. 34 ›› Issue (6): 197-206.doi: 10.16265/j.cnki.issn1003-3033.2024.06.0814

• 应急技术与管理 • 上一篇    下一篇

不确定条件下大型铁路建设工程的物资储备基地选址优化

张锦1,2,3(), 杨文广1, 孙文杰1,2,3, 申皓1,2,3,**(), 洪治潮1,2,3, 李国旗1,2,3   

  1. 1 西南交通大学 交通运输与物流学院,四川 成都 611756
    2 西南交通大学 综合交通运输智能化国家地方联合工程实验室,四川 成都 611756
    3 西南交通大学综合交通大数据应用技术国家工程实验室,四川 成都 611756
  • 收稿日期:2023-12-12 修回日期:2024-03-15 出版日期:2024-06-28
  • 通讯作者:
    **申 皓(1996—),男,山西长治人,博士研究生,研究方向为交通运输系统规划及工程物流。E-mail:
  • 作者简介:

    张 锦 (1963—),男,四川广元人,博士,教授,主要从事物流系统规划、交通运输规划与管理方面的研究。E-mail:

    李国旗 副教授

  • 基金资助:
    四川省自然科学基金资助(2022NSFSC0417)

Facility location of material reserve bases for large railway projects under uncertainty

ZHANG Jin1,2,3(), YANG Wenguang1, SUN Wenjie1,2,3, SHEN Hao1,2,3,**(), HONG Zhichao1,2,3, LI Guoqi1,2,3   

  1. 1 School of Transportation and Logistics, Southwest Jiaotong University, Chengdu Sichuan 611756, China
    2 National United Engineering Laboratory of Integrated and Intelligent Transportation, Southwest Jiaotong University, Chengdu Sichuan 611756, China
    3 National Engineering Laboratory of Integrated Transportation Big Data Application Technology, Southwest Jiaotong University, Chengdu Sichuan 611756, China
  • Received:2023-12-12 Revised:2024-03-15 Published:2024-06-28

摘要:

为提升复杂环境下铁路建设工程物流设施网络的可靠性,首先,使用情景削减技术生成最小中断情景子集及其中断概率,以描述运输通道的中断情景;然后,采用多面体不确定集刻画物流需求的不确定性,以运输成本、建设成本、运营成本以及惩罚成本等综合成本最低为目标,应用两阶段的随机优化技术与鲁棒优化技术,构建物资储备基地选址不确定优化模型,并基于一种列与约束生成(C&CG)算法求解模型;最后,以复杂环境下的C铁路建设工程为例,验证模型和算法的有效性。结果表明:在随机中断情景中,模型获取方案的成本变异系数是传统模型的4.3%,在极端需求波动情况下,模型获取方案的成本波动幅度可达传统模型的38%,两阶段不确定优化模型能有效减少物流设施网络因运输通道中断及需求波动导致的成本变动。

关键词: 铁路建设工程, 物资储备基地, 选址优化, 工程物流, 情景削减, 鲁棒优化, 列与约束生成(C&CG)算法

Abstract:

In order to improve the reliability of the logistics facility network of railway construction projects in complex environments, scenario reduction techniques were used to generate a minimum subset of disruption scenarios and their disruption probabilities to describe the disruption scenarios of transport channels. The polyhedral uncertainty sets were used to describe the uncertainty of logistics demand. To minimize the combined costs of transport, construction, operation and penalty costs, a two-stage stochastic and robust optimisation technique was applied to construct an uncertainty optimisation model for the location of material reserves bases. The model was solved based on a C&CG algorithm. The validity of the model and the algorithm was verified by taking a C railway construction project in a complex environment as an example. The results show that the cost variation coefficient of the model-acquired solutions is 4.3% of the traditional model in the random disruption scenario, and the cost fluctuation of the model-acquired solutions can be up to 38% of that of the traditional model in the extreme demand fluctuation. The two-stage uncertainty optimisation model given in this paper can effectively reduce the cost variation of the logistics facility network resulting from the disruption of transport channels and demand fluctuations.

Key words: railway projects, material reserve bases, facility location, engineering logistics, scenario reduction, robust optimization, column and constraint generation (C&CG) algorithm

中图分类号: