[1] HOLLNAGEL E. Human reliability analysis: context and control [M]. London: Academic Press, 1993:159-202. [2] CHEN Dawei, TIAN Hanzhi. Behavior based safety for accidents prevention and positive study in China construction project [J]. Procedia Engineering, 2012, 43: 528-534. [3] CHOUDHRY R M. Behavior-based safety on construction sites: a case study [J]. Accident Analysis & Prevention, 2014, 70: 14-23. [4] LI Heng, LU Miaoia, HSU Shuchien, et al. Proactive behavior-based safety management for construction safety improvement [J]. Safety Science, 2015, 75: 107-117. [5] LEE Pinchan, WEI Junhao, HSIN-I Ting, et al. Dynamic analysis of construction safety risk and visual tracking of key factors based on behavior-based safety and building information modeling [J]. KSCE Journal of Civil Engineering, 2019, 23(10): 4 155-4 167. [6] 郭聖煜, 郭文会, 宫培松. 地铁施工工人不安全行为统计过程控制研究 [J]. 中国安全科学学报, 2018, 28(7): 153-158. GUO Shengyu, GUO Wenhui, GONG Peisong. Research on statistical process control of metro construction workers' unsafe behaviors [J]. China Safety Science Journal, 2018, 28(7): 153-158. [7] 陈大伟, 田翰之, 张江石. 基于行为安全的建筑事故预防量化方法与实证研究 [J]. 中国安全科学学报, 2010, 20(7): 96-102. CHEN Dawei, TIAN Hanzhi,ZHANG Jiangshi. A quantitative method for construction accidents prevention based on behavior safety and its empirical study [J]. China Safety Science Journal, 2010, 20(7): 96-102. [8] 张洪, 宫运华, 傅贵. 基于“2-4”模型的建筑施工高处坠落事故原因分类与统计分析 [J]. 中国安全生产科学技术, 2017, 13(9): 169-174. ZHANG Hong, GONG Yunhua, FU Gui. Causes classification and statistical analysis on falling accidents on construction sites based on "2-4" model [J]. Journal of Safety Science and Technology, 2017, 13(9): 169-174. [9] 孙世梅,赵金坤,傅贵.基于“2-4”模型的高处坠落事故行为原因研究[J].中国安全科学学报,2019,29(8):23-28. SUN Shimei, ZHAO Jinkun, FU Gui. Study on behavioral causes of falling accidents based on "2-4" model [J]. China Safety Science Journal, 2019,29(8):23-28. [10] 杨奇, 周红波, 唐强达. 考虑系统特征的概率风险分析方法在塔吊施工安全风险评估中的应用 [J]. 安全与环境学报, 2020, 20(5): 1 637-1 644. YANG Qi, ZHOU Hongbo, TANG Qiangda. Modified probability risk analysis approach to the risk assessment of the tower crane safety on account of its system specialty [J]. Journal of Safety and Environment, 2020, 20(5): 1 637-1 644. [11] 宋博.DEA-BP神经网络下地铁车站深基坑施工安全评价[J].中国安全科学学报,2019,29(5):91-96. SONG Bo. Safety evaluation for deep foundation pit construction in metro station based on DEA-BP neural network[J]. China Safety Science Journal, 2019,29(5):91-96. [12] SHAO Bo, HU Zhigen, LIU Quan, et al. Fatal accident patterns of building construction activities in China [J]. Safety Science, 2019, 111: 253-263. [13] ZHOU Zhipeng, IRIZARRY J, LI Qiming. Using network theory to explore the complexity of subway construction accident network (SCAN) for promoting safety management [J]. Safety Science, 2014, 64: 127-136. [14] 王莉, 王建平, 许娜, 等. 基于知识图谱的地铁工程事故知识建模与分析 [J]. 土木工程与管理学报, 2019, 36(5): 109-114,122. WANG Li, WANG Jianping, XU Na, et al. Knowledge graph-based metro engineering accidents knowledge modeling and analysis [J]. Journal of Civil Engineering and Management, 2019, 36(5): 109-114,122. [15] FANG Weili, MA Ling, LOVE P E, et al. Knowledge graph for identifying hazards on construction sites: integrating computer vision with ontology [J]. Automation in Construction, 2020, 119: 103310.1-103310.10. [16] 刘思峰. 灰色系统理论及其应用(第8版) [M]. 北京: 科学出版社, 2017: 79-81. [17] FARD M M, TEROUHID S A, KIBERT C J, et al. Safety concerns related to modular/prefabricated building construction[J]. International Journal of Injury Control and Safety Promotion, 2017, 24(1): 10-23. [18] GÜRCANLI G E ,BARADAN S , UZUN M. Risk perception of construction equipment operators on construction sites of Turkey[J]. International Journal of Industrial Ergonomics, 2015, 46: 59-68. [19] 中华人民共和国住房和城乡建设部.住建部房屋市政工程生产安全事故情况通报[EB/OL].[2020-12-22].http://www.mohurd.gov.cn/. |