中国安全科学学报 ›› 2017, Vol. 27 ›› Issue (2): 70-74.doi: 10.16265/j.cnki.issn1003-3033.2017.02.013

• 安全工程技术科学 • 上一篇    下一篇

一种考虑认知不确定性的风险矩阵分析方法

段永胜1, 赵继广2 教授, 陈鹏1, 赵蓓蕾1   

  1. 1 装备学院 航天装备系,北京 101416
    2 装备学院 装备发展战略研究所,北京 101416
  • 收稿日期:2016-12-01 修回日期:2017-01-18 出版日期:2017-02-28 发布日期:2020-11-22
  • 作者简介:段永胜 (1987—),男,山西忻州人,博士研究生,主要研究方向为航天任务分析与设计。E-mail:duanys_vip@yeah.net。

A risk matrix analysis method considering cognitive uncertainty

DUAN Yongsheng1, ZHAO Jiguang2, CHEN Peng1, ZHAO Beilei1   

  1. 1 Department of Space Equipment, Equipment Academy, Beijing 101416, China
    2 Equipment Development Strategy Research Institute, Equipment Academy, Beijing 101416, China
  • Received:2016-12-01 Revised:2017-01-18 Online:2017-02-28 Published:2020-11-22

摘要: 为解决传统风险矩阵(CRM)元素等级分配的非一致性问题,提出一种考虑风险决策者认知不确定性的风险矩阵分析方法。首先,采用等级序数“乘法原则”计算风险指数,并将风险指数作为风险矩阵元素等级分配的依据。其次,引入风险决策者关注度系数,用来描述风险潜在信息的影响,并以指数的形式修正传统风险指数计算模型。最后,将修正后的连续概率后果分布(CPCD)映射到CRM。以风险指数最大化原则分配风险矩阵元素等级。运用该方法,分析某航天发射场某型低温液氢加注系统风险等级量化过程。结果表明,采用修正后的风险指数计算模型,能够得到不同加注工序不同关注度系数的风险等级分配方案,风险决策者的认知不确定性对低温液氢加注风险等级分配有影响。

关键词: 传统风险矩阵(CRM), 风险指数, 认知不确定性, 航天发射场, 低温液氢加注系统

Abstract: In order to deal with the inconsistency of element level allocation in CRM, a new risk matrix analysis method, considering the cognitive uncertainty of risk decision makers, was proposed. Firstly, the risk indexes were calculated by adopting the “multiplication principle” of level numbers. The risk indexes were used as the basis for level allocation of risk matrix. Secondly, the decision maker's attention coefficients were incorporated to describe the influences of potential risks. The traditional risk index calculation model was modified by the attention coefficients. Then, the modified continuous probability consequence diagram (CPCD) was mapped to the CRM. The risk matrix element levels were allocated based on the principle of maximum risk index. The risk level quantification process of a certain type of cryogenic liquid hydrogen filling system on a certain space launching site was analyzed by this method. The results show that risk level allocation schemes of different filling procedures can be obtained with the modified risk index model,and that the cognitive uncertainty of risk decision makers has an influence on risk level allocation of the cryogenic liquid hydrogen filling system.

Key words: conventional risk matrix(CRM), risk index, cognitive uncertainty, space launch site, cryogenic liquid hydrogen filling system

中图分类号: