[1] International Atomic Energy Agency. Factors affecting public and political acceptance for the implementation of geological disposal[Z], 2007. [2] 王驹. 我国高放废物深地质处置战略规划探讨[J]. 铀矿地质, 2004, 20(4):196-204, 212. WANG Ju. Strategic program for deep geological disposal of high level radioactive waste in China[J]. Uranium Geology, 2004, 20(4): 196-204, 212. [3] 潘自强, 钱七虎. 我国高放废物地质处置战略研究[J]. 中国核电, 2013, 6(2):194-196. PAN Ziqiang, QIAN Qihu. The geological disposal of high-level radioactive waste strategy research in our country[J]. China Nuclear Power, 2013, 6(2):194-196. [4] STARR C. Social benefit versus technological risk[J]. Science, 1969, 165:1 232-1 238. [5] The Dutch Technical Advisory Committee on Water Defences (TAW). Some considerations of an acceptable level of risk in the Netherland[M]. Amsterdam: TAW, 1985: 32-76. [6] BOTTELBERGHS P H. Risk analysis and safety policy developments in the Netherland[J]. Journal of Hazardous Materials, 2000, 71: 59-84. [7] Health and Safety Executive (HSE). Risk criteria for land use planning in the vicinity of major industrial hazards[R]. Her Majesty's Stationery Office, 1989. [8] Health and Safety Executive (HSE). The tolerability of risks from nuclear power stations[R]. Her Majesty's Stationery Office, 1988. [9] Z-013 Rev.2.NorskStandard,Risk and emergency preparedness analysis[S]. 2001. [10] 李典庆,唐文勇,张圣坤. 海洋工程风险接受准则研究进展[J]. 海洋工程, 2003, 21(2): 96-102. LI Dianqing, TANG Wenyong, ZHANG Shengkun. Review of risk acceptance criteria for ocean engineering[J]. The Ocean Engineering, 2003, 21(2): 96-102. [11] 胡群芳, 黄宏伟. 隧道及地下工程风险接受准则计算模型研究[J]. 地下空间与工程学报, 2006, 2(1):60-64. HU Qunfang, HUANG Hongwei. Study on the modeling of risk acceptance criteria for tunnel and underground engineering[J].Chinese Journal of Underground Space and Engineering, 2006, 2(1):60-64. [12] 周杨. 长大隧道工程建设期风险接受准则研究[D]. 上海: 同济大学, 2007. ZHOU Yang. Risk acceptance criteria of long large tunnels in construction period[D]. Shanghai: Tongji University, 2007. [13] 李红英,谭跃虎. 滑坡灾害风险可接受准则计算模型研究[J]. 地下空间与工程学报, 2013, 9(增2): 2 047-2 052. LI Hongying, TAN Yuehu. Study on the computational model of risk acceptance criteria for landslide disaster[J]. Chinese Journal of Underground Space and Engineering, 2013, 9(S2): 2 047-2 052. [14] 周兴波,周建平,杜效鹄,等. 我国大坝可接受风险标准研究[J]. 水力发电学报,2015, 34(1): 63-72. ZHOU Xingbo, ZHOU Jianping, DU Xiaohu, et al. Study on risk acceptance criteria for dams in China [J]. Journal of Hydroelectric Enginnering, 2015, 34(1): 63-72. [15] 核工业北京地质研究院. 核设施退役及放射性废物治理科研项目建议书[R],2014. Beijing Research Institute of Uranium Geology. Recommendation of research on the treatment of radioactive waste and retired nuclear facilities[R], 2014. [16] 核工业北京地质研究院. 国家首座高放废物地质处置地下实验室候选场址筛选技术报告[R],2015. Beijing Research Institute of Uranium Geology. Screening report of candidate sites for China first underground research laboratory of high-level radioactive waste geological disposal[R], 2015. [17] DEGN E S, TENGBOR P, KAMPMANN J, et al. Guidelines for tunnelling risk management: international tunnelling association, working group No. 2[J]. Tunnelling and Underground Space Technology, 2004, 19(3): 217-237. [18] Health and Safety Executive (HSE). Reducing risks: protecting people-HSE's decision making process[R]. London: Her Majesty’s Stationery Office, 2001, 21-52. [19] RASBASH D J. Tolerability of risk from nuclear power stations: health and safety executive, published by HMSO, London, pp. 36; price: £4.95, ISBN 0-118839-82-9[J]. Fire Safety Journal, 1988, 13(2/3): 227-229. [20] 尚志海,刘希林. 国外可接受风险标准研究综述[J]. 世界地理研究, 2010, 19(3): 72-80. SHANG Zhihai, LIU Xilin. Overviews on foreign acceptable risk criteria[J]. World Regional Studies, 2010, 19(3): 72-80. [21] DAI F C, LEE C F, NGAI Y Y. Landslide risk assessment and management: an overview[J]. Engineering Geology, 2002, 64(1): 65-87. [22] 李漾,周昌玉,张伯君. 石油化工行业可接受风险水平研究[J]. 安全与环境学报, 2007, 7(6): 116-119. LI Yang, ZHOU Changyu, ZHANG Bojun. Study on acceptable level of risk in petrochemical industry[J]. Journal of Safety and Environment, 2007, 7(6): 116-119. [13] 杜效鹄,杨健. 我国水电站大坝溃坝生命风险标准讨论[J]. 水力发电, 2010, 36(5): 68-70,94. DU Xiaohu, YANG Jian. Discuss on risk standard of life loss caused by hydropower dam failure in China [J]. Water Power, 2010, 36(5): 68-70,94. [14] 赵峰,夏永旭,常海兵. 中国公路隧道运营风险接受准则研究[J]. 中外公路, 2014, 34(6): 191-197. ZHAO Feng, XIA Yongxu, CHANG Haibing. Study on the risk acceptance criteria of the tunnel operation of China highway[J]. Journal of China & Foreign Highway, 2014, 34(6): 191-197. [25] 李燕庭. 铁路建设工程风险分级标准研究[D]. 成都: 西南交通大学, 2014. LI Yanting. Research on risk classification criteria of railway construction projects[D]. Chengdu: Southwest Jiaotong University, 2014. [26] FARMER F R. Siting criteria-a new approach[C].Proceedings of the IAEA Symposium on Nuclear Siting,1967:303-329. [27] VRIJLING J K, VAN G P. Societal risk and the concept of risk aversion[J]. Advances in Safety and Reliability, 1997,1:45-52. |