[1] 国家安全监管总局,国家煤矿安监局,国家能源局,国家铁路局.建筑物、水体、铁路及主要井巷煤柱留设与压煤开采规范[L].2017- 05-17. [2] 许家林,尤琪,朱卫兵,等.条带充填控制开采沉陷的理论研究[J].煤炭学报,2007,32(2):119-122. XU Jialin,YOU Qi,ZHU Weibing,et al.Theoretical study of strip-filling to control mining subsidence[J].Journal of China Coal Society,2007,32(2):119-122. [3] 郝建,石永奎,隗峰,等.条带充填置换条带煤柱技术研究[J].湖南科技大学学报:自然科学版,2013,28(2):16-19. HAO Jian,SHI Yongkui,KUI Feng,et al.Study on technology of on replacing strip coal pillars by strip-filling mining[J].Journal of Hunan University of Science and Technology:Science Edition,2013,28(2):16-19. [4] 王光伟.膏体充填开采遗留条带煤柱的理论研究与实践[D].徐州:中国矿业大学,2014. WANG Guangwei.Research on theory and practice of mining legacy strip pillar with paste backfilling[D].Xuzhou:China University of Mining and Technology,2014. [5] 郭忠平,黄万朋.矸石倾斜条带充填体参数优化及其稳定性分析[J].煤炭学报,2011,36(2):234-238. GUO Zhongping,HUANG Wanpeng.Parameter optimization and stability analysis of inclined gangue strip-fillings[J].Journal of China Coal Society,2011,36(2):234-238. [6] 郭惟嘉,江宁,王海龙,等.膏体置换煤柱充填体承载特性及工作面支护强度研究[J].采矿与安全工程学报,2016,33(4):585-591. GUO Weijia,JIANG Ning,WANG Hailong,et al.Bearing characteristics of filling body and supporting intensity of working face during coal pillar mined with paste backfill[J].Journal of Mining and Safety Engineering,2016,33(4):585-591. [7] 张兆江,张涛,张安兵,等.超高水材料充填条带开采地表沉陷规律研究[J].煤炭工程,2016,48(7):97-99. ZHANG Zhaojiang,ZHANG Tao,ZHANG Anbing,et al.Surface subsidence law for strip mining with super high-water material backfilling[J].Coal Engineering,2016,48(7):97-99. [8] 赵庆彪,陈亚杰,周华强,等.小屯矿“建下”膏体充填综采研究[C].中国煤炭学会开采专业委员会2010年学术年会论文集,2010:49-57. [9] 董恩远.膏体条带充填开采充填体布置参数研究[D].太原:太原理工大学,2015. DONG Enyuan.Theoretical study on layout parameters of filling body in strip-filling mining technology using cementing[D].Taiyuan:TaiyuanUniversity of Technology,2015. [10] 郭文兵,邓喀中,邹友峰.条带开采下沉系数计算与优化设计的神经网络模型[J].中国安全科学学报,2006,16(6):40-45. GUO Wenbing,DENG Kazhong,ZOU Youfeng.Calculation of subsidence factor in strip mining[J].China Safety Science Journal,2006,16(6):40-45. [11] 张帅帅,尹土兵.基于FLAC3D的充填体内巷道稳定性分析[J].中国安全科学学报,2017,27(8):85-90. ZHANG Shuaishuai,YIN Tubing.Analysis of stability of tunnel in backfill based on FLAC3D[J].China Safety Science Journal,2017,27(8):85-90. [12] 张华兴.煤矿开采损害的评价与防护[J].煤矿开采,2015,20(3):1-2. ZHANG Huaxing.Evaluation and prevention of mining subsidence in coal mines[J].Coal Mining Technology,2015,20(3):1-2. [13] 邹友峰.条带开采优化设计及其地表沉陷预计的三围层状介质理论[M].北京:科学出版社,2011:35-38. |