超高层ICCP安全监测与控制的预警指标研究

左自波1,2 工程师, 潘曦1,2 高级工程师, 黄玉林**1,2 教授级高工, 汪小林3 高级工程师, 张龙龙1,2   

  1. 1.上海建工集团股份有限公司,上海 200080;
    2.上海建工集团工程研究总院,上海 201114;
    3.上海建工四建集团有限公司,上海 201103
  • 收稿日期:2019-10-12 修回日期:2019-12-23 出版日期:2020-01-28 发布日期:2021-01-22
  • 通讯作者: ** 黄玉林(1977—),男,黑龙江克山人,博士,教授级高工,主要从事超高层建筑数字建造技术工作。E-mail: hyl040908@163.com。
  • 作者简介:左自波 (1986—),男,陕西安康人,硕士,工程师,主要从事土木工程数字建造技术工作E-mail: zuozibo@foxmail.com。
  • 基金资助:
    国家重点研发计划项目(2017YFC0805500);上海市优秀技术带头人计划项目(16XD1421600)。

Early warning indicators for safety monitoring and control of super high-rise ICCP

ZUO Zibo1,2, PAN Xi1,2, HUANG Yulin1,2, WANG Xiaolin3, ZHANG Longlong1,2   

  1. 1. Shanghai Construction Group Co., Ltd., Shanghai 200080, China;
    2. General Engineering Institute of Shanghai Construction Group, Shanghai 201114, China;
    3. Shanghai Construction No.4. (Group) Co., Ltd., Shanghai 201103, China
  • Received:2019-10-12 Revised:2019-12-23 Online:2020-01-28 Published:2021-01-22

摘要: 为了精确监控整体爬升平台(ICCP)的作业安全,探讨ICCP与超高层安全监控基本原理的内在联系和差异,收集哈利法塔、上海中心、台北101大厦等20个国内外超高层安全监测工程实例,统计和分析施工期和运营期的关键监测项目及指标,并对监测项目重要性程度进行分级,基于超高层建筑安全监测工程实例的统计分析结果和大量ICCP的工程实践,给出ICCP关键监测项目及预警指标;以塔楼最高为368 m的3座非对称连体塔楼超高层建筑为背景,通过现场试验验证ICCP安全监控项目和预警指标的合理性。结果表明:ICCP监测指标均处于合理范围,施工平台架体的水平度最终控制在20 mm以内;所提出的ICCP预警指标,有助于提高超高层施工的安全保障能力及信息化水平。

关键词: 超高层建筑, 整体爬升平台(ICCP), 安全监控, 监测项目, 预警指标

Abstract: In order to accurately monitor operation safety of ICCP, internal relations and differences of basic principles for safety monitoring between ICCP and super high-rise buildings were discussed. With twenty safety monitoring projects for super high-rise buildings as examples, including Burj Khalifa, Shanghai Center and Taipei 101, statistical analysis was made for key monitoring items and indicators during construction and operation periods, and these items were graded according to importance. Then, based on statistical analysis results and a large number of ICCP practices, ICCP key monitoring items and warning indicators were presented, which was verified by field test of a high-rise building with three asymmetric connected towers, 368 m high at maximum. The results show that ICCP monitoring indicators are in a reasonable range, and levelness of platform frame is finally controlled within 20 mm. And proposed ICCP warning indicators can help improve security capability and informationization of super high-rise building construction.

Key words: super high-rise building, integral climbing construction platform (ICCP), safety monitoring, monitoring project, early warning indicator