[1] 张超然, 戴会超, 高季章, 等. 特大型水电工程建设和运行面临的主要科技问题[J]. 水利学报, 2007,18(增1): 7-14. ZHANG Chaoran, DAI Huichao, GAO Jizhang, et al. The major coming science and technology problems in construction and operation of super hydropower engineering[J]. Shuili Xuebao,2007,18(S1): 7-14. [2] 樊启祥. 水力资源开发要与生态环境和谐发展—金沙江下游水电开发的实践[J]. 水力发电学报, 2010, 29(4): 1-5. FAN Qixiang. Water resources utilization based on sustainable ecosystems:practice of Jingsha River hydropower development[J]. Journal of Hydroelectric Engineering, 2010, 29(4): 1-5. [3] 吴斌平, 任炳昱, 钟登华. 基于边缘优先和空间冲突的拱坝浇筑仿真研究[J]. 系统仿真学报, 2013, 25(7):1 560-1 567. WU Binping, REN Bingyu, ZHONG Denghua. Research of construction simulation for arch dam based on margin-priority principal and spatial conflicts [J]. Journal of System Simulation, 2013, 25(7): 1 560-1 567. [4] 周武, 吴新霞, 李端有. 水利水电工程施工机械设备安全规划理论研究[J]. 长江科学院院报, 2012, 29(5): 90-94. ZHOU Wu,WU Xinxia,LI Duanyou. Safety planning for construction equipment of water conservancy and hydropower project [J]. Journal of Yangtze River Scientific Research Institute, 2012, 29(5): 90-94. [5] AKINCI B, FISCHEN M, LEVITT R, et al. Formalization and automation of time-space conflict analysis[J]. Journal of Computing in Civil Engineering, 2002, 16(2): 124-134. [6] RILEY D R, SANVIDO V E. Space planning method for multistory building construction[J]. Journal of Construction Engineering and Management, 1997, 123(2): 171-180. [7] SACKS R, ROZENFELD O, ROSENFELD Y. Spatial and temporal exposure to safety hazards in construction[J]. Journal of Construction Engineering and Management, 2009, 135(8): 726-736. [8] ROZENFELD O, SACKS R, ROSENFELD Y. 'CHASTE': construction hazard assessment with spatial and temporal exposure[J]. Construction Management and Economics, 2009, 27(7): 625-638. [9] GUO S J. Integrating CAD and schedule for identification and resolution of work space conflicts between subcontractors[J].Canadian Journal of Civil Engineering, 2001, 28(5): 759-768. [10] 胡超, 赵春菊, 周宜红, 等. 高拱坝仓面施工时空冲突分析与调整方法研究[J]. 水力发电学报, 2017, 36(5): 19-27. HU Chao, ZHAO Chunju, ZHOU Yihong, et al. Time-space conflict analysis and adjustment methods for pouring concrete of high arch dams [J]. Journal of Hydroelectric Engineering,2017,36(5): 19-27. [11] 陈述, 申浩播, 郑霞忠, 等. 大坝浇筑立体交叉作业空间竞争程度研究[J]. 水力发电学报, 2018, 37(7): 106-112. CHEN Shu, SHEN Haobo, ZHENG Xiazhong, et al. Competition of spatial conflict strength during crossoperation of dam construction[J]. Journal of Hydroelectric Engineering, 2018, 37(7): 106-112. [12] 胡振中, 张建平, 张新. 基于四维时空模型的施工现场物理碰撞检测[J]. 清华大学学报:自然科学版,2010, 50(6): 820-825. HU Zhenzhong, ZHANG Jianping, ZHANG Xin. Construction collision detection for siteentities based on 4-D space-time model[J]. Journal of Tsinghua University:Science & Technology, 2010, 50(6): 820-825. [13] KOO B, KIM J, KIM J I. An empirical study of MEP workspace modeling approaches for 4D model-based time-space conflict analyses: case study on t-he international linear collider project[J]. KSCE Journal of Civil Engineering, 2012, 17(4): 627-637. [14] ROHANI M, SHAFABAKHSH G, HADDAD A, et al. Strategy management of construction workspaces by con-flict resolution algorithm and visualization model[J]. Engineering, Construction and Architectural Management, 2018, 25(8): 1 053-1 074. [15] 袁嘉杉, 朱昌锋, 武永贵. 铁路事故应急资源调度决策研究[J]. 中国安全科学学报, 2018, 28(12):158-164. YUAN Jiashan, ZHU Changfeng, WU Yonggui. Dispatching decision of emergency resources for railway accidents [J]. China Safety Science Journal, 2018, 28(12):158-164. |