China Safety Science Journal ›› 2021, Vol. 31 ›› Issue (7): 15-23.doi: 10.16265/j.cnki.issn 1003-3033.2021.07.003
• Safety social science and safety management • Previous Articles Next Articles
WANG Qiankun1,2, ZHU Ke1,2, WANG Junwu1,2, GUO Peiwen1, SHEN Wenzhong1,2
Received:
2021-04-11
Revised:
2021-06-11
Online:
2021-07-28
Published:
2022-01-28
CLC Number:
WANG Qiankun, ZHU Ke, WANG Junwu, GUO Peiwen, SHEN Wenzhong. Bibliometric analysis of engineering project risk management literature[J]. China Safety Science Journal, 2021, 31(7): 15-23.
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.cssjj.com.cn/EN/10.16265/j.cnki.issn 1003-3033.2021.07.003
[1] KE Yongjian, WANG Shouqing, CHAN A P C. Risk management practice in China's public private partnership projects [J]. Journal of Civil Engineering and Management, 2012,18(5):675-684. [2] AMEYAW E E, CHAN A P C, OWUSU-MANU D G , et al. A fuzzy-based evaluation of financial risks in build own operate transfer water supply projects [J]. Journal of Infrastructure Systems, 2017,23(4):1-13. [3] 王乾坤,年春光,杨冬,等. 基于T-S模糊神经网络的地铁深基坑安全预警 [J]. 中国安全科学学报, 2018,28(8):161-167. WANG Qiankun, NIAN Chunguang, YANG Dong, et al. Early warning of risks in metro deep foundation pit construction based on T-S fuzzy neural network [J]. China Safety Science Journal, 2018,28(8):161-167. [4] 陈伟,乔治,王伟震,等. 暴雨灾害引发施工安全事故应急处置SD模型[J].中国安全科学学报, 2017,27(6):169-174. CHEN Wei, QIAO Zhi, WANG Weizhen, et al. SD model for emergency disposal of construction safety accident caused by rainstorm disaster [J]. China Safety Science Journal, 2017,27(6):169-174. [5] 吴贤国,覃亚伟,沈梅芳,等.基于云推理的运营隧道结构健康安全风险评价研究[J].中国安全科学学报,2017, 27(2):133-138. WU Xianguo, QIN Yawei, SHEN Meifang, et al. Research on health and safety risk assessment of operational tunnels based on cloud reasoning [J]. China Safety Science Journal, 2017,27(2):133-138. [6] 张鹏,原亮明. 铁路运营安全风险和隐患双重预防模型 [J]. 中国安全科学学报, 2019,29(增1):163-167. ZHANG Peng, YUAN Liangming. Research on double-preventive model of railway operation safety risk and hidden danger [J]. China Safety Science Journal, 2019,29(S1):163-167. [7] ALOINI D, DULMIN R, MININNO V. Risk management in erp project introduction: review of the literature [J]. Information & Management, 2007,44(6):547-567. [8] PINTO A, NUNES I L, RIBEIRO R A. Occupational risk assessment in construction industry-overview and reflection [J]. Safety Science, 2011,49(5):616-624. [9] TURSKIS Z, GAJZLER M, DZIADOSZ A. Reliability, risk management, and contingency of construction processes and projects [J]. Journal of Civil Engineering and Management, 2012,18(2):290-298. [10] XIA Nini, ZOU P X W, GRIFFIN M A , et al. Towards integrating construction risk management and stakeholder management: a systematic literature review and future research agendas [J]. International Journal of Project Management, 2018,36(5):701-715. [11] NADERPOUR A, SARDROUD J M, MOFID M , et al. Uncertainty management in time estimation of construction projects: a systematic literature review and new model development [J]. Scientia Iranica, 2019,26(2):752-778. [12] GANBAT T, CHONG H Y, LIAO P C , et al. A cross-systematic review of addressing risks in building information modelling enabled international construction projects [J]. Archives of Computational Methods in Engineering, 2019,26(4):899-931. [13] CHO Y J. A review of construction delivery systems: focus on the construction management at risk system in the Korean public construction market [J]. KSCE Journal of Civil Engineering, 2016,20(2):530-537. [14] YIU N S N, CHAN D W M, SHAN M , et al. Implementation of safety management system in managing construction projects: benefits and obstacles [J]. Safety Science, 2019,117:23-32. [15] ECK N J V, WALTMAN L. Software survey: VOSviewer, a computer program for bibliometric mapping [J]. Scientometrics, 2010,84(2):523-538. [16] NICHOLLS P T. Price's square root law: empirical validity and relation to Latka's law [J]. Information Processing and Management, 1988,24(4):469-478. [17] BARRIOS M, BORREGO A, VILAGINES A , et al. A bibliometric study of psychological research on tourism [J]. Scientometrics: An International Journal for All Quantitative Aspects of the Science of Science Policy, 2008,77(3):453-467. [18] LI Jie,FLORIS G, GENSERIK R. An overview of scientometric mapping for the safety science community: methods, tools, and framework [J]. Safety Science, 2021,134:DOI: 10.1016/j.ssci.2020.105093. [19] TAM C M, ZENG Saixing, DENG Zhongming . Identifying elements of poor construction safety management in China [J]. Safety Science, 2004,42(7):569-586. [20] CARTER G, SMITH S D. Safety hazard identification on construction projects [J]. Journal of Construction Engineering and Management, 2006,132(2):197-205. [21] CHAN A P C, NWAOGU J M, NASLUND J A. Mental health risk factors in the construction industry: systematic review [J]. Journal of Construction Engineering and Management, 2020,146(3):1-13. [22] WANG Shouqing, TIONG R L K, TING S K , et al. Evaluation and management of political risks in China's bot projects [J]. Journal of Construction Engineering and Management-Asce, 2000,126(3):242-250. [23] LIAO Chiawen, PERNG Y H. Data mining for occupational injuries in the Taiwan construction industry [J]. Safety Science, 2008,46(7):1 091-1 102. [24] TANG Wenzhe, QIANG Maoshan, DUFFIELD C F , et al. Risk management in the Chinese construction industry [J]. Journal of Construction Engineering and Management, 2007,133(12):944-956. [25] DU Lei, TANG Wenzhe, LIU Chunna , et al. Enhancing engineer-procure-construct project performance by partnering in international markets: perspective from Chinese construction companies [J]. International Journal of Project Management, 2016,34(1):30-43. [26] LIU Jingkuang, GONG Enqin, WANG Dong, et al. Cloud model-based safety performance evaluation of prefabricated building project in China [J]. Wireless Personal Communications, 2018,102(4):3 021-3 039. [27] CARBONARA N, COSTANTINO N, GUNNIGAN L , et al. Risk management in motorway PPP projects: empirical-based guidelines [J]. Transport Reviews, 2015,35(2):162-182. [28] PARK H, HAN S H, ROJAS E M , et al. Social network analysis of collaborative ventures for overseas construction projects [J]. Journal of Construction Engineering and Management, 2011,137(5):344-355. [29] ZWIKAEL O, AHN M. The effectiveness of risk management: an analysis of project risk planning across industries and countries [J]. Risk Analysis, 2011,31(1):25-37. [30] TAYLAN O, BAFAIL A O, ABDULAAL R M S , et al. Construction projects selection and risk assessment by fuzzy ahp and fuzzy topsis methodologies [J]. Applied Soft Computing, 2014,17:105-116. [31] NIETO-MOROTE A, RUZ-VILA F. A fuzzy approach to construction project risk assessment [J]. International Journal of Project Management, 2011,29(2):220-231. [32] EYBPOOSH M, DIKMEN I, BIRGONUL M T. Identification of risk paths in international construction projects using structural equation modeling [J]. Journal of Construction Engineering and Management, 2011,137(12):1 164-1 175. [33] CARR V, TAH J H M. A fuzzy approach to construction project risk assessment and analysis: construction project risk management system [J]. Advances in Engineering Software, 2001,32(10/11):847-857. [34] LEE E, PARK Y, SHIN J G. Large engineering project risk management using a bayesian belief network [J]. Expert Systems with Applications, 2009,36(3):5 880-5 887. [35] AMINBAKHSH S, GUNDUZ M, SONMEZ R. Safety risk assessment using analytic hierarchy process during planning and budgeting of construction projects [J]. Journal of Safety Research, 2013,46:99-105. [36] EBRAHIMNEJAD S, MOUSAVI S M, SEYRAFIANPOUR H. Risk identification and assessment for build-operate-transfer projects: a fuzzy multi attribute decision making model [J]. Expert Systems with Applications, 2010,37(1):575-586. [37] YANG R J, ZOU P X W. Stakeholder-associated risks and their interactions in complex green building projects: a social network model [J]. Building and Environment, 2014,73:208-222. [38] FANG Chao, MARLE F. A simulation-based risk network model for decision support in project risk management [J]. Decision Support Systems, 2012,52(3):635-644. [39] TOKDEMIR O B, EROL H, DIKMEN I. Delay risk assessment of repetitive construction projects using line-of-balance scheduling and monte carlo simulation [J]. Journal of Construction Engineering and Management, 2019,145(2): DOI:10.1061/(ASCE)CO.1943-7862.0001595. [40] LIU Haotien, TSAI Y I. A fuzzy risk assessment approach for occupational hazards in the construction industry [J]. Safety Science, 2012,50(4):1 067-1 078. [41] HARTMANN T, VAN MEERVELD H, VOSSEBELD N , et al. Aligning building information model tools and construction management methods [J]. Automation in Construction, 2012,22:605-613. [42] PARK C S, KIM H J. A framework for construction safety management and visualization system [J]. Automation in Construction, 2013,33:95-103. [43] ALHAWARI S, KARADSHEH L, TALET A N , et al. Knowledge-based risk management framework for information technology project [J]. International Journal of Information Management, 2012,32(1):50-65. [44] HAN S H, KIM D Y, KIM H , et al. A web-based integrated system for international project risk management [J]. Automation in Construction, 2008,17(3):342-356. [45] ZHOU Ying, DING Lieyun, CHEN Lijuan. Application of 4D visualization technology for safety management in metro construction [J]. Automation in Construction, 2013,34:25-36. [46] WU Weiwei, YANG Huanjia, LI Qiming , et al. An integrated information management model for proactive prevention of struck-by-falling-object accidents on construction sites [J]. Automation in Construction, 2013,34:67-74. [47] ZOU Yang, KIVINIEMI A, JONES S W. Developing a tailored RBS linking to BIM for risk management of bridge projects [J]. Engineering Construction and Architectural Management, 2016,23(6):727-750. [48] SUN Chengshuang, MAN Qingpeng, WANG Yaowu. Study on BIM-based construction project cost and schedule risk early warning [J]. Journal of Intelligent & Fuzzy Systems, 2015,29(2):469-477. [49] DONG Chao, WANG Fan, LI Heng , et al. Knowledge dynamics-integrated map as a blueprint for system development: applications to safety risk management in Wuhan metro project [J]. Automation in Construction, 2018,93:112-122. [50] XU Xin, YUAN Chenxi, ZHANG Yuxi, et al. Ontology-based knowledge management system for digital highway construction inspection [J]. Transportation Research Record, 2019,2673(1):52-65. [51] VITHARANA V H P, CHINDA T. Structural equation modelling of lower back pain due to whole-body vibration exposure in the construction industry [J]. International Journal of Occupational Safety and Ergonomics, 2019,25(2):257-267. [52] RUDOLF C A, SPINLER S. Key risks in the supply chain of large scale engineering and construction projects [J]. Supply Chain Management-an International Journal, 2018,23(4):336-350. [53] ABDELGAWAD M, FAYEK A R. Fuzzy reliability analyzer: quantitative assessment of risk events in the construction industry using fuzzy fault-tree analysis [J]. Journal of Construction Engineering and Management, 2011,137(4):294-302. [54] ARDESHIR A, AMIRI M, GHASEMI Y , et al. Risk assessment of construction projects for water conveyance tunnels using fuzzy fault tree analysis [J]. International Journal of Civil Engineering, 2014,12(4):396-412. [55] KARIMIAZARI A, MOUSAVI N, MOUSAVI S F , et al. Risk assessment model selection in construction industry [J]. Expert Systems with Applications, 2011,38(8):9 105-9 111. [56] ZHAO Huiru, LI Nana. Risk evaluation of a UHV power transmission construction project based on a cloud model and FCE method for sustainability [J]. Sustainability, 2015,7(3):2 885-2 914. [57] CHANG Tengyuan, DENG Xiaopeng, HWANG Bongang, et al. Improving quantitative assessment of political risk in international construction projects: the case of Chinese construction companies [J]. Journal of Construction Engineering and Management, 2019,145(12):04019083.1-04019083.10. [58] MARLE F, VIDAL L A, BOCQUET J C. Interactions-based risk clustering methodologies and algorithms for complex project management [J]. International Journal of Production Economics, 2013,142(2):225-234. [59] LU Fuqiang, BI Hualing, HUANG Min, et al. Simulated annealing genetic algorithm based schedule risk management of IT outsourcing project [J]. Mathematical Problems in Engineering, 2017,2017:1-17. [60] TAILLANDIER F, TAILLANDIER P, TEPELI E , et al. A multi-agent model to manage risks in construction project [J]. Automation in Construction, 2015,58:1-18. |
[1] | ZHAO Jinlong, JIA Chenxi, CUI Huaying, PENG Xiandu. Analysis on research topic and curriculum setting of safety engineering undergraduate theses [J]. China Safety Science Journal, 2024, 34(2): 8-14. |
[2] | ZHANG Chao, WENG Wenguo, CHEN Yong, DAI Baoqian, QIN Tingxin. Characteristics of urban public safety risk and its enlightenment for risk management [J]. China Safety Science Journal, 2024, 34(1): 223-230. |
[3] | SUN Diange. Research on the construction of civil airport safety management system based on digital twin technology [J]. China Safety Science Journal, 2023, 33(S1): 222-227. |
[4] | LI Sicong, XU Tao. A review of research on occupational hygiene risk assessment and management of pharmaceutical dusts [J]. China Safety Science Journal, 2023, 33(8): 219-230. |
[5] | TONG Ruipeng, HU Xiangyang, HE Jiehua, SUN Ninghao. Risk zoo(Ⅰ): composition and characterization of risk mapping based on metaphor theory [J]. China Safety Science Journal, 2023, 33(6): 27-34. |
[6] | ZANG Chengjun, QU Yuan, GAO Xu. Coal mine safety performance assessment methods based on risk management and control [J]. China Safety Science Journal, 2022, 32(S1): 29-33. |
[7] | ZHAO Chenyu, ZHANG Tianwei, ZHANG Guiyun, GUO Zidong. Bibliometric analysis on cup burners based on scientometric mapping [J]. China Safety Science Journal, 2021, 31(9): 157-166. |
[8] | SHEN Yang, XU Lei, WANG Shaochun. Research on early-warning index for deformation of integrated scaffoldingand formwork with steel platform based on risk management [J]. China Safety Science Journal, 2021, 31(6): 56-63. |
[9] | XU Xingpeng, XU Qingfeng, FANG Zhiming, LYU Wei, HUANG Rongyan. Development trend of global terrorist attacks and analysis on casualty risk [J]. China Safety Science Journal, 2021, 31(6): 170-175. |
[10] | TONG Ruipeng, WANG Lulu, LI Hongwei, GAO Ning, AN Yu. Discussion on relationship between safety management, risk management and emergency management based on Macro-security view [J]. China Safety Science Journal, 2021, 31(5): 36-44. |
[11] | FU Gui, YANG Xiaoyu, LIU Zhuoxu, TONG Ruipeng, KONG Qingduan, GUO Lijuan. Studies on fundamentals of safety science [J]. China Safety Science Journal, 2021, 31(5): 18-24. |
[12] | MA Dan, PEI Yulong, TIAN Kun. Literature review of pedestrian traffic safety research based on bibliometric analysis [J]. China Safety Science Journal, 2020, 30(8): 101-108. |
[13] | SONG Shouxin, CHEN Mingli, ZHAI Huaiyuan. Research on strategy of antifragile mechanism in safety risk management [J]. China Safety Science Journal, 2020, 30(12): 8-15. |
[14] | GUO Shuxiang, YUE Junlin, ZHU Xi, LIN Xin, LI Bo, LI Shuqiang. Application research on railway passenger safety system based on risk management [J]. China Safety Science Journal, 2018, 28(S1): 172-177. |
[15] | FAN Zhengri. Cycle analysis and characteristics for the occurrence of major railway accidents in China [J]. China Safety Science Journal, 2018, 28(S1): 135-140. |
Viewed | ||||||
Full text |
|
|||||
Abstract |
|
|||||