China Safety Science Journal ›› 2026, Vol. 36 ›› Issue (5): 165-173.doi: 10.16265/j.cnki.issn1003-3033.2026.05.0952
• Safety Technology and Engineering • Previous Articles Next Articles
Ren Jie1,2(
), Qu Shiru2, Wang Lili1, Han Yuansong1, Sun Zhiyuan1
Received:2025-12-14
Revised:2026-02-28
Online:2026-05-28
Published:2026-11-28
CLC Number:
Ren Jie, Qu Shiru, Wang Lili, Han Yuansong, Sun Zhiyuan. Risk assessment model for true north transition in aviation based on STPA-BN[J]. China Safety Science Journal, 2026, 36(5): 165-173.
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.cssjj.com.cn/EN/10.16265/j.cnki.issn1003-3033.2026.05.0952
Table 2
Mapping of UCAs to hazards
| 控制行为 | UCA类型 | 不安全场景 | 触发条件 | 关联危险 |
|---|---|---|---|---|
| 政策制定滞后 | 未提供 | 缺乏实施细则,无法启动设备/ 系统设计改造 | 政策协调效率<50% | H-1 |
| 改装方案不兼容 | 错误提供 | 硬件冲突,设备运行不稳定 | 未纳入老旧机型替换协议 | H-2 |
| 提前进入真北运行 | 时机错误 | 混合运行未验证,空管指令解读混乱 | 空管培训覆盖率<80%,技术验证不足 | H-3 |
| 数据维护延迟 | 持续时间不当 | 导航数据库过期,航图与运行不一致 | 数据提供商资源调配不足 | H-4 |
| 缺乏改造补贴 | 未提供 | 企业因成本过高推迟改造计划 | 财政预算未设专项资金 | H-5 |
| 导航设施校准误差 | 参数错误 | 误差超限,影响运行精度 | 校准工具缺失或培训不足 | H-2/H-6 |
| 备份激活失败 | 持续时间不当 | GNSS失效未能及时激活惯导备份 | 应急程序机制缺失,测试覆盖不足 | H-7 |
Table 7
Stage-wise probability adjustment of parent nodes and rationale
| 阶段 | 政策延迟概率 | 技术滞后概率 | 阶段特征与优化措施 |
|---|---|---|---|
| t0阶段 (决策基准年) | 0.30 | 0.25 | 启动阶段,初始不确定性高。设立启动基金,制定初步过渡计划。风险主要源于政策意向和技术可行性的初始不确定性 |
| t0+5阶段 (标准生效期) | 0.40→0.20 | 0.50→0.15 | 国际标准生效,执行挑战显现。初期各国协调复杂度高,政策风险上升;大规模技术改造启动,技术问题集中暴露(T先升)。随着协调机制建立和技术问题被攻克,期末2项风险均显著下降 |
| t0+10阶段 (首区过渡期) | 0.30→0.10 | 0.35→0.05 | 示范效应显现,学习曲线加速。首批地区实现全面“真北”运行,其成功经验为全球政策协调提供动力(P降),并促进技术方案的标准化与成熟化(T降) |
| t0+20阶段 (过渡完成期) | 0.10→0.05 | 0.15→0.01 | 全球切换基本完成,系统趋于稳定。超过90%的空域已完成切换,混合运行场景急剧减少。政策和技术层面的系统性风险已得到有效控制,降至很低水平 |
| t0+28阶段 (自然淘汰期) | 0.05→0.01 | 0.05→0.01 | 系统进入稳态,残余风险极低。依赖“磁北”的老旧设备已自然淘汰殆尽,“真北”成为唯一基准。系统进入长期稳态运行,残余风险接近可忽略水平 |
Table 10
Dynamic evolution of key risk indicators
| 阶段 | C2 | C1 | S |
|---|---|---|---|
| t0阶段 (决策基准年) | p=0.35, RV=1.05 | p=0.41, RV=1.23 | p=0.852 |
| t0+5阶段 (标准生效期) | p=0.15, RV=0.45 | p=0.20, RV=0.60 | p=0.484 |
| t0+10阶段 (首区过渡期) | p=0.05, RV=0.15 | p=0.10, RV=0.30 | p=0.200 |
| t0+20阶段 (过渡完成期) | p=0.01, RV=0.03 | p=0.05, RV=0.15 | p=0.050 |
| t0+28阶段 (自然淘汰期) | p=0.01, RV=0.03 | p=0.01, RV=0.03 | p=0.010 |
| [1] |
|
| [2] |
International Coordinate Council of Aerospace Industries Associations. ICCAIA true north whitepaper v.1.1: true north ICCAIA Ad-hoc group white paper v1. 1[R/OL]. (2023-11-20). https://iccaia.org/wp-content/uploads/2023/11/True-North-ICCAIA-White-Paper-v1.1-20Nov2023.pdf.
|
| [3] |
ICAO/ANB/OPS. Survey report survey on moving from a magnetic to a true north reference system for heading and tracking in aviation operations[R/OL]. (2023-11-20). https://www.navnin.nl/new/wp-content/uploads/2023/07/True-north-survey_AHRTAG_V1.pdf.
|
| [4] |
doi: 10.1016/j.proeng.2015.11.498 |
| [5] |
doi: 10.1016/j.proeng.2015.11.500 |
| [6] |
|
| [7] |
|
| [8] |
张子昂, 张晓全. 基于STPA 和模糊贝叶斯网络的大型无人驾驶航空器运行风险分析[J]. 航空工程进展, 2026, 17(1):72-80, 89.
|
|
|
|
| [9] |
王洁宁, 李保燊, 冀姗姗. 基于STPA和模糊BN的AIDC移交人误研究[J]. 中国安全科学学报, 2019, 29(9): 27-35.
doi: 10.16265/j.cnki.issn1003-3033.2019.09.005 |
|
doi: 10.16265/j.cnki.issn1003-3033.2019.09.005 |
|
| [10] |
席永涛, 刘鹏杰, 胡甚平, 等. 基于STPA和FTPN的海上自主水面船舶航行实时风险评估[J]. 中国安全科学学报, 2024, 34(8):18-26.
doi: 10.16265/j.cnki.issn1003-3033.2024.08.1290 |
|
doi: 10.16265/j.cnki.issn1003-3033.2024.08.1290 |
|
| [11] |
|
| [12] |
|
| [13] |
张玉磊, 朱德米. 重大决策社会稳定风险评估中的利益相关者参与:行动逻辑与模式构建[J]. 上海行政学院学报, 2018, 19(5):70-81.
|
|
|
|
| [14] |
门茂林, 王智, 薛慧艳, 等. 真北定向测量方法及其对比分析[J]. 城市勘测, 2018(5):135-137.
|
|
|
|
| [15] |
doi: 10.1016/j.proeng.2015.11.499 |
| [16] |
doi: 10.1016/j.ijhydene.2023.07.250 |
| [1] | Guan Wenling, Wang Yutong, Wang Li, Ren Changxing, Dong Chengjie. Risk assessment for physical hazard-bearing bodies based on consequences of hazardous chemical accidents and vulnerability [J]. China Safety Science Journal, 2026, 36(5): 105-112. |
| [2] | Tang Huabin, Xu Lei, Chen Siyu, Ma Songhua. Risk assessment for overdue in-service pressure pipelines based on BOA-SAM-FTA [J]. China Safety Science Journal, 2026, 36(4): 57-64. |
| [3] | ZHAO Bo. Risk assessment model for embankment slope failure in mining goafs [J]. China Safety Science Journal, 2026, 36(2): 121-126. |
| [4] | LIU Kunqi, YANG Juan, LI Ziyi, LI Peng, WU Jiansong, LIU Chang. Risk assessment of new urban power systems under extreme weather conditions based on BN-MC [J]. China Safety Science Journal, 2026, 36(1): 157-166. |
| [5] | YANG Dashen, XIA Ji, WEI Rongfang, LIANG Dong, HU Yiming, WANG Renchao. Technical system for geological hazard prevention in mountainous areas pipelines and case studies [J]. China Safety Science Journal, 2025, 35(S2): 14-20. |
| [6] | DU Yan, LYU Mengjia, WANG Qikai, XIE Mowen, JIANG Yujing, LIU Jingnan. Research on risk assessment model of creep landslide instability based on RLE and SF [J]. China Safety Science Journal, 2025, 35(S2): 43-49. |
| [7] | LIAO Guangdong, YU Shilei. Comprehensive prevention and control system for work safety in metallurgical enterprises based on risk quantitative evaluation [J]. China Safety Science Journal, 2025, 35(S1): 21-28. |
| [8] | WANG Yizhao, BAI Wenfeng, HE Qinglun, WANG Fei, CHEN Long, HE Sen. A methodology for road collapse risk assessment based on data augmentation [J]. China Safety Science Journal, 2025, 35(S1): 234-238. |
| [9] | QIN Tingrong, ZHANG Xiaojing, LUO Pingping, WU Zhixuan, GUI Yuxiang, XI Yongtao. Risk assessment of ship berthing operations in heavy fog based on cloud model [J]. China Safety Science Journal, 2025, 35(9): 159-166. |
| [10] | LI Rong, LIU Qing, WANG Lei, ZHONG Yue, LAN Yufeng, NAN Hang. Social risk assessment of Three Gorges lock scheduling mode based on SNA-BN [J]. China Safety Science Journal, 2025, 35(8): 148-155. |
| [11] | NIE Ruxin, WANG Luo, ZHANG Ziyu. Risk assessment of public opinion on extreme rainstorm disasters based on three-way decisions under event system theory [J]. China Safety Science Journal, 2025, 35(8): 227-235. |
| [12] | ZHANG Honghai, TANG Sijia, WAN Junqiang. Research on collision risk of parallel air routes under autonomous aircraft operation [J]. China Safety Science Journal, 2025, 35(8): 70-83. |
| [13] | CHEN Zi, QIU Huawan, LIU Jiayu, YANG Siyu, LI Zhiyong. Risk assessment of deep foundation pits in subway stations based on variable fuzzy sets [J]. China Safety Science Journal, 2025, 35(6): 105-110. |
| [14] | CUI Jinghui, DONG Guoyu, ZHANG Zengqiang, SUN Ninghao, TONG Ruipeng. Analysis and evaluation model of oil and gas pipeline contractor behavior safety risk [J]. China Safety Science Journal, 2025, 35(6): 19-26. |
| [15] | LI Hang, HAN Feng, HU Xiaobing. Risk assessment method of urban UAVs falling onto ground transportation [J]. China Safety Science Journal, 2025, 35(6): 157-164. |
| Viewed | ||||||
|
Full text |
|
|||||
|
Abstract |
|
|||||