[1] 王贤来,姚维信,王虎,等.矿山废石全尾砂充填研究现状与发展趋势[J].中国矿业,2011,20(9): 76-79. WANG Xianlai, YAO Weixin, WANG Hu, et al. The directions of R&D on backfill with waste rock and total tailings in underground mine[J].China Mining Magazine,2011,20(9): 76-79. [2] 韩斌,吴爱祥,王贻明,等.低强度粗骨料超细全尾砂自流胶结充填配合比优化及应用[J].中南大学学报:自然科学版,2012,43(6): 2 357-2 362. HAN Bin, WU Aixiang, WANG Yiming, et al. Optimization and application of cemented hydraulic fill (CHF) with low strength aggregate and extra fine grain full tailings [J]. Journal of Central South University:Science and Technology, 2012,43(6): 2 357-2 362. [3] 杨坚,尹土兵,刘科伟,等.全尾砂胶结充填体强度影响因素响应面法研究[J].中国安全科学学报,2017,27(12): 103-109. YANG Jian, YIN Tubing, LIU Kewei, et al.Study on factors affecting strength of tailings backfill body with response surface method[J].China Safety Science Journal,2017,27(12): 103-109. [4] 张吉雄,缪协兴.煤矿矸石井下处理的研究[J].中国矿业大学学报,2006,35(2): 197-200. ZHANG Jixiong, MIAO Xiexing. Underground disposal of waste in coal mine[J].Journal o f China University of Mining & Technology,2006,35(2): 197-200. [5] 宋卫东,任海锋,曹帅.侧限压缩条件下充填体与岩柱相互作用机理[J].中国矿业大学学报,2016,45(1):49-55,95. SONG Weidong, REN Haifeng, CAO Shuai. Interaction mechanism between backfill and rock pillar under confined compression condition[J].Journal o f China University of Mining & Technology,2016,45(1):49-55,95. [6] 戴华阳,郭俊廷,阎跃观,等.“采-充-留”协调开采技术原理与应用[J].煤炭学报,2014, 39(8): 1 602-1 610. DAI Huayang, GUO Junting, YAN Yueguan, et al. Principle and application of subsidence control technology of mining coordinately mixed with backfilling and keeping[J].Journal of China Coal Society,2014, 39(8): 1 602-1 610. [7] LIU Zhixiang, LAN Ming, XIAO Siyou, et al. Damage failure of cemented backfill and its reasonable match with rock mass [J]. Transactions Nonferrous Metals Society of China, 2015,25(3): 954-959. [8] 杜坤,李地元,金解放,等.充填体与岩体能量和强度匹配的分析及应用[J].中国安全科学学报,2011,21(12): 82-87. DU Kun, LI Diyuan, JIN Jiefang, et al. Matching analysis of energy and strength between backfill and rock mass and its application[J].China Safety Science Journal,2011,21(12): 82-87. [9] 武汉科技大学.一种缓倾斜松软顶板薄矿床充填采矿方法:中国,CN201310096731.6[P].2013- 06-12. [10] 王其虎. 地下开采中接触带复合岩体非协调变形及控制研究[D].武汉:武汉科技大学,2015. WANG Qihu. Study on contact zone composite rock mass incompatible deformation and control in underground mining[D].Wuhan:Wuhan University of Science and Technology,2015. [11] LIU Yanzhang, YE Yicheng, SHENG Jianlong, et al. Stope parameter selection of Exi Iron ores based on analysis of surface deformations[C]. Proceedings of 2011 AASRI Conference on Artificial Intelligence and Industry Application (AASRI-AIIA 2011), 2011: 230-234. [12] 吴琼,彭龙辉.砂岩骨料用于万达高速公路低等级混凝土的试验研究[J].公路工程,2013,38(5): 161-164. WU Qiong, PENG Longhui. Studies on use of sandstone aggregate for low-grade concrete of Wanzhou-Dazhou highway[J].Highway Engineering,2013,38(5): 161-164. |