中国安全科学学报 ›› 2019, Vol. 29 ›› Issue (S1): 81-87.doi: 10.16265/j.cnki.issn1003-3033.2019.S1.016

• 安全工程技术科学 • 上一篇    下一篇

基于IEC62425的CTCS-3列控系统安全评估体系*

王阳 副研究员   

  1. 中国铁道科学研究院集团有限公司 铁道科学技术研究发展中心,北京 100081
  • 收稿日期:2019-03-20 修回日期:2019-05-29 出版日期:2019-06-30 发布日期:2020-10-28
  • 作者简介:王 阳 (1978—),男,黑龙江牡丹江人,硕士,副研究员,主要从事铁路安全技术及工程、铁路安全管理、铁路信号安全评估等方面的研究。E-mail:wy93601@qq.com。
  • 基金资助:
    中国铁道科学研究院创新基金资助(2018YJ130)。

Study on safety evaluation of CTCS-3 level train control system based on IEC62425

WANG Yang   

  1. R & D Center of Railway Science and Technology, China Academy of Railway Science, Beijing 100081, China
  • Received:2019-03-20 Revised:2019-05-29 Online:2019-06-30 Published:2020-10-28

摘要: 为提高高速铁路信号系统的安全性和可靠性,依据IEC62425标准推荐的安全评估技术及方法,研究适用于第三级中国列车控制系统(CTCS-3)的系统安全风险矩阵、安全风险接受准则、安全需求分配、安全相关应用条件传递等安全性要求和指标,划分CTCS-3列控系统全生命周期阶段,探讨适用的安全评估技术、安全评估工作流程和安全评估生命周期各阶段关键活动。研究表明:符合IEC62425标准要求的CTCS-3列控系统安全评估体系,可以有效地识别系统运行功能、接口功能、数据传输的薄弱环节,为系统功能安全实现创造有利条件。

关键词: IEC62425, CTCS-3列控系统, 安全评估技术, 最低风险可接受准则(ALARP), 信号系统生命周期

Abstract: In order to improve the security and reliability of high speed railway signal system, according to the safety assessment technology and method recommended by IEC62425 standard, the security requirement and index were studied, which is suitable for CTCS-3 train control system and includes system security risk matrix, distribution of safety risk acceptance criteria, safety requirements and safety related applications conditions, etc. The stages of CTCS-3 train control system in the whole life cycle were divided, and the applicable safety assessment technology, safety assessment work flow and key activities in each stage of life cycle assessment were discussed. The research shows that the security evaluation system of ctcs-3 train control system, which meets the requirements of IEC62425 standard, can effectively identify the weak links of system operation function, interface function and data transmission, and create favorable conditions for the security implementation of system functions.

Key words: IEC62425, CTCS-3 train control system, safety technology, as low as reasonably practicable (ALARP), signal system life cycle

中图分类号: