中国安全科学学报 ›› 2024, Vol. 34 ›› Issue (4): 239-246.doi: 10.16265/j.cnki.issn1003-3033.2024.04.1748

• 职业卫生 • 上一篇    下一篇

超高海拔隧道施工人员生理指标变化及劳动强度研究

赵树磊(), 孙兵3, 陈稳干3, 徐寅峰3, 王俊峰3, 郭春1,2   

  1. 1 西南交通大学 土木工程学院,四川 成都 610031
    2 西南交通大学 交通隧道工程教育部重点实验室,四川 成都 610031
    3 中铁十局集团第三建设有限公司,安徽 合肥 230031
  • 收稿日期:2023-10-15 修回日期:2024-01-17 出版日期:2024-04-28
  • 作者简介:

    赵树磊 (1997—),男,内蒙古赤峰人,博士研究生,研究方向为隧道及地下工程防灾减灾与环境控制。E-mail:

    孙兵 工程师

    陈稳干 高级工程师

    郭春 教授

  • 基金资助:
    中国交通教育研究会教育科学研究课题(JT2022YB163); 中国交通教育研究会教育科学研究课题(JT2022YB405); 四川省交通运输科技项目(2021-ZL-04); 成都医学院四川应用心理学研究中心资助项目(CSXL-23327)

Physiological indicators and labor intensity of tunnel construction workers at ultra-high altitude

ZHAO Shulei(), SUN Bing3, CHEN Wengan3, XU Yinfeng3, WANG Junfeng3, GUO Chun1,2   

  1. 1 School of Civil Engineering, Southwest Jiaotong University, Chengdu Sichuan 610031, China
    2 Key Laboratory of Transportation Tunnel Engineering, Ministry of Education,Southwest Jiaotong University, Chengdu Sichuan 610031, China
    3 No.3 Construction Company of China Railway No.10 Engineering Group, Hefei Anhui 230031, China
  • Received:2023-10-15 Revised:2024-01-17 Published:2024-04-28

摘要:

为评估超高海拔隧道施工人员劳动强度,采用理论分析法确定施工人员劳动强度评价指标,并依托某超高海拔隧道采用可穿戴设备监测分析不同工序施工过程中人员生理指标变化,进而计算不同工序人员劳动强度及劳动效率。研究结果表明:不同工序施工人员劳动过程中生理指标变化存在明显区别,其中,二衬钢筋布设人员心血管负荷超过卫生限值,机械操作人员血氧饱和度(SpO2)低于规范值;超高海拔隧道二衬钢筋布设劳动强度为Ⅴ级,底板施工与仰拱钢筋绑扎劳动强度等级为Ⅲ级,二衬防水布铺设与机械操作人员劳动强度等级为Ⅱ级;海拔4 700 m时,隧道施工人员劳动效率仅为平原地区的76%~88%;完成与平原地区相同的工作量,相应工序的人工工日消耗需要增加13.63%~31.58%。

关键词: 超高海拔隧道, 施工人员, 生理指标, 劳动强度, 劳动效率

Abstract:

To assess the labor intensity of construction personnel in ultra-high-altitude tunnels, this study employed theoretical analysis to define evaluation indicators and used wearable devices to monitor physiological changes during various construction phases in a specific ultra-high-altitude tunnel. Subsequently, labor intensity and efficiency of different tasks were calculated. Results reveal that the physiological indicators of different tasks are significantly different. Specifically, cardiovascular loads of the workers installing secondary lining steel bars exceed the hygienic limits, and peripheral oxygen saturation (SpO2) levels of the mechanical operators is lower than the standard values. Labor intensity is classified as Grade V for installing secondary lining steel bars, Grade III for bottom plate construction and arch steel bar binding, and Grade II for installing secondary lining waterproof cloth and for mechanical operations. At an altitude of 4 700 meters, the labor efficiency ranges only from 76% to 88% compared to the plain areas. To match the workload in the plain areas, the labor input must be increased by approximately 13.63% to 31.58% depending on the process.

Key words: ultra-high-altitude tunnel, construction workers, physiological indicators, labor intensity, labor efficiency

中图分类号: