中国安全科学学报 ›› 2025, Vol. 35 ›› Issue (S2): 196-202.doi: 10.16265/j.cnki.issn1003-3033.2025.S2.0031

• 防灾减灾技术与工程 • 上一篇    下一篇

露天采场边坡稳定性研究:以巴润矿为例

杜文秀1(), 闫路2,**()   

  1. 1 内蒙古包钢钢联股份有限公司巴润矿业分公司, 内蒙古 包头 014599
    2 甘肃镜铁山矿业有限公司, 甘肃 张掖 735101
  • 收稿日期:2025-08-27 出版日期:2026-02-04
  • 通信作者:
    **闫 路(1999—),男,甘肃酒泉人,本科,助理工程师,主要从事矿山边坡稳定性监测工作。E-mail:
  • 作者简介:

    杜文秀 (1985—),男,内蒙古乌兰察布人,硕士,高级工程师,主要从事矿山生产管理、矿山边坡治理及边坡稳定性方面的工作。E-mail:

Stability of open-pit mining slope: a case study of Barun mine

DU Wenxiu1(), YAN Lu2,**()   

  1. 1 Barun Mining Branch, Inner Mongolia Baotou Steel Union Co., Ltd., Baotou Inner Mongolia 014599, China
    2 Gansu Jingtieshan Mining Co., Ltd., Zhangye Gansu 735101, China
  • Received:2025-08-27 Published:2026-02-04

摘要:

为系统评估露天采场边坡稳定性,以内蒙古巴润露天矿采场为例,采用极限平衡法与二维数值模拟方法,分别对现状整体边坡及设计终了边坡进行稳定性分析,并开展岩土参数敏感性分析。结果表明:边坡潜在破坏模式呈复合型特征。现状边坡在自重及自重+爆破工况下的稳定系数均满足规范要求;设计终了边坡在含水/疏干情况下均呈稳定状态,二维数值模拟结果(稳定系数1.32)证明其具备稳定性。稳定系数对内摩擦角变化敏感,黏聚力变化影响较弱。现状坡与设计终了坡在2种工况下均具备良好稳定性。基于剥采比优化需求,维持坡顶位置时可适度增大边坡角,但水位上升会导致稳定系数降低。

关键词: 露天矿, 边坡稳定性, 极限平衡, 数值模拟, 敏感性分析

Abstract:

To systematically assess the slope stability of the open-pit mining stope, the Barun open-pit mine in Inner Mongolia was taken as the example. The limit equilibrium method and two-dimensional numerical simulation method were used to conduct stability analysis on the current overall slope and the final slope at the design end, respectively, and carry out the sensitivity study of geotechnical parameters. The results show that the potential failure mode of the slope presents a composite characteristic. The stability coefficients of the current slope under both self-weight and self-weight plus blasting conditions meet the requirements of the specifications. At the end of the design, the slope is in a stable state under the conditions of water content/drainage. The two-dimensional numerical simulation results (stability coefficient 1.32) further verify the slope stability. The stability coefficient is sensitive to the change in the friction angle, while the influence of the change in cohesion is relatively weak. Both the current slope and the designed final slope demonstrate good stability under both operating conditions. According to the optimization requirements of the stripping ratio, the slope angle can be moderately increased when the top position of the slope is maintained, but the rise in water level will lead to a decrease in the stability coefficient.

Key words: open-pit mine, slope stability, limit equilibrium, numerical simulation, sensitivity analysis