China Safety Science Journal ›› 2018, Vol. 28 ›› Issue (12): 89-95.doi: 10.16265/j.cnki.issn1003-3033.2018.12.015

• Safety Science of Engineering and Technology • Previous Articles     Next Articles

Safety control analysis of new-constructed pipeline overpassing subway station

WANG Kaixuan1, WANG Yu2, KANG Rongxue1, WEI Lijun1, SUN Enji1   

  1. 1 China Academy of Safety Science and Technology, Beijing 100012, China
    2 School of Civil Engineering Beijing Jiaotong University, Beijing 100044, China
  • Received:2018-09-29 Revised:2018-11-07 Published:2020-11-25

Abstract: In order to control the differential settlement of new-constructed pipelines overpassing subway station at a short distance,a deformation calculation model was built based on the Pasternak-type two-parameter model and the three polyline elastic-plastic load transfer model. The finite difference method was used to solve this problem. A case was used to analyze vertical displacement and bending moment of pipeline. The influences of parameters were discussed. The results show that at a certain distance from the station edge line, vertical response of pipeline tends to be stable, and taking two times of the station width as the impact length can meet the practical requirements, that it is advisable to use materials with larger elastic modulus in the underlying soil, that for the pipeline of the impact section, improving pipeline stiffness is helpful to control differential settlement, and grouting reinforcement underlying soil can obviously reduce the differential settlement, and that when the engineering grouting length is 0.5 L, the area between area of 0.5-0.75 L and 1.75-2 L away from the subway station edge should be reinforced.

Key words: new-constructed pipeline, subway station, active vertical response, Pasternak foundation model, differential settlement