China Safety Science Journal ›› 2019, Vol. 29 ›› Issue (3): 133-138.doi: 10.16265/j.cnki.issn1003-3033.2019.03.022

• Safety Science of Engineering and Technology • Previous Articles     Next Articles

Research on sealing technology of screen pipe based on creep deformation

ZHANG Qi1,2, WEI Guoying1,2,3, QIN Binbin4, LIU Wei1,2, WANG Junming1,2   

  1. 1 School of Safety Science and Engineering, Henan Polytechnic University, Jiaozuo Henan 454003, China;
    2 Research Center of the National Gas Geology and Gas Prevention Engineering, Jiaozuo Henan 454003, China;
    3 Collaborative Innovation Center of Coal Safety Production of Henan, Jiaozuo Henan 454003, China;
    4 School of Energy & Mineral Engineering, China University of Mining & Technology Beijing, Beijing 100083, China
  • Received:2018-12-03 Revised:2019-01-19 Published:2020-11-26

Abstract: In order to solve the problem of low extraction flow rate and concentration caused by borehole deformation in the process of extraction, theFLAC3D software was used to build a deformation model of coal body around the borehole based on creep law, and the creep displacements and plastic-zone shape change of coal body around conventional and preset screen pipe were compared and analyzed. The technology of sealing hole inner screen extraction was put forward to improve the borehole support force and ensure the borehole extraction section, and the industrial test was carried out. The results show that after the completion of the borehole, the hole wall is affected by the circumambient pressure, and the coal body presents the creep pressing characteristics towards the direction of borehole, that compared with conventional borehole, the shape variable of sieve tube drilling is obviously smaller, and that after adopting the sealing technology of preset screen pipe extraction, on the 65 day of extraction, the volume of extraction increases by 191% and concentration increases by 137% compared with the conventional sealing technology, and the extraction efficiency is significantly improved.

Key words: gas extraction, creep law, screen, boreholes, FLAC3Dsimulation

CLC Number: