China Safety Science Journal ›› 2020, Vol. 30 ›› Issue (6): 71-77.doi: 10.16265/j.cnki.issn1003-3033.2020.06.011

• Safety engineering technology • Previous Articles     Next Articles

Comprehensive governance technology for fully-mechanized mining face across abandoned roadways in thick coal seam

ZHANG Yaohui1,2, LI Xifan3, XIONG Zuqiang3, WANG Cheng3   

  1. 1. Department of Resources and Environment, Henan College of Industry and Information, Jiaozuo Henan 454003, China;
    2. State Key Laboratory of Geohazard Prevention and Geoenvironment Protection, Chengdu University of Technology, Chengdu Sichuan 610059, China;
    3. School of Energy Science and Engineering, Henan Polytechnic University, Jiaozuo Henan 454003, China
  • Received:2020-03-11 Revised:2020-05-07 Online:2020-06-28 Published:2021-01-28

Abstract: In order to address impacts of various types of abandoned roadways on normal mining of working face in thick coal seam, field surveys, theoretical analysis and other methods were used to summarize occurrence characteristics and hazards of abandoned roadways which were divided into complete types along bottom, complete types along top, and fallen ones, and different treatment methods for them were proposed. Meanwhile, in order to meet needs of various construction schemes, sulfoaluminate-based multifunctional grouting materials were developed, and comprehensive governance technology for fully-mechanized mining face passing abandoned roadways in thick coal seam was proposed. Finally, with Sihe coal mine, Chengzhuang coal mine and Guozhuang coal mine taken as engineering backgrounds, filling pillar support, high water filling and deep-hole grouting methods were applied respectively to treat abandoned roadways, and their governance effectiveness was investigated. The results show that after specific treatment of empty roadways, there will be no sloughing and roof accidents, and roof pressure becomes normal, thus ensuring safe mining of working faces.

Key words: thick coal seam mining, abandoned roadway, pumping pillars, high water quick-setting material, grouting reinforcement

CLC Number: