China Safety Science Journal ›› 2022, Vol. 32 ›› Issue (6): 87-94.doi: 10.16265/j.cnki.issn1003-3033.2022.06.1896

• Safety engineering technology • Previous Articles     Next Articles

Safety analysis of train operation in long downhill curve sections of heavy haul railways

WEN Dengqin1(), WANG Fei2, SHI Jin3, REN Shujing3   

  1. 1 Ji'nan Qingdao High Speed Railway Co., Ltd., Ji'nan Shandong 250102, China
    2 State Key Laboratory of Rail Transit Engineering Informatization (FSDI), Xi'an Shaanxi 710043, China
    3 School of Civil Engineering, Beijing Jiaotong University, Beijing 100044, China
  • Received:2022-02-02 Revised:2022-04-12 Online:2022-06-28 Published:2022-12-28

Abstract:

In order to ensure operation safety of heavy haul railways in long ramp curve sections, safety performance of long marshalling heavy haul trains in such sections under braking mode was studied with coupler swing angle, derailment coefficient, wheel rail lateral force, wheel load reduction rate, wheel surface fatigue index and wheel rail wear index as evaluation indicators. And a train-line dynamic model was established and verified based on measured data. The results show that when coupler force reaches the maximum, the train may not be in curve sections. For 1+1 marshalling trains, the maximum coupler force appears at the part of central locomotive. However, for the case of 2+0 trains, when it starts braking 900 m away from the intersection of line and spiral, the maximum coupler force reaches the maximum value, which occurs at the 62nd coupler. Moreover, the curve radius shall not be less than 1 200 m, or no less than 1 000 m under difficult conditions, while length of transition curve no less than 150 m.

Key words: heavy haul railway, operation safety performance, emergency braking, long and large downhill, curve section