[1] 蓝航, 陈东科, 毛德兵. 我国煤矿深部开采现状及灾害防治分析田[J]. 煤炭科学技术, 2016, 44 (1): 39-46. LAN Hang, CHEN Dongke, MAO Debing. Current status of deep mining and disaster prevention in China[J]. Coal Science and Technology,2016,44(1): 39-46. [2] 张宏伟, 李云鹏, 陈蓥, 等. 三硬条件下孤岛区域大直径钻孔防冲方案优化[J]. 安全与环境学报, 2017, 17(5): 1 823-1 827. ZHANG Hongwei, LI Yunpeng, CHEN Ying, et al. Research on bumping prevention scheme optimization of large diameter drilling in isolated area under three hard conditions[J]. Journal of Safety and Environment, 2017, 17(5): 1 823-1 827. [3] 姜耀东, 潘一山, 姜福兴, 等.我国煤炭开采中的冲击地压机理和防治[J]. 煤炭学报, 2014, 39(2): 205-213. JIANG Yaodong, PAN Yishan, JIANG Fuxing, et al. State of the art review on mechanism and prevention of coal bumps in China[J]. Journal of China Coal Society, 2014, 39(2): 205-213. [4] 钱鸣高, 石平五, 许家林. 矿山压力及岩层控制[M]. 徐州: 中国矿业大学出版社, 2010: 323-324. [5] 靖文青, 侯晓松, 徐洪泽, 等. 基于FLAC模拟的钻孔卸压技术参数设计[J]. 煤炭与化工, 2014, 37(1): 105-108. JING Wenqing, HOU Xiaosong, XU Hongze, et al. Borehole pressure relief parameters design based on FLAC simulation[J]. Coal and Chemical Industry, 2014, 37(1): 105-108. [6] 朱斯陶, 姜福兴, 史先锋, 等. 防冲钻孔参数确定的能量耗散指数法[J]. 岩土力学, 2015, 36(8): 2 270-2 276. ZHU Sitao, JIANG Fuxing, SHI Xianfeng, et al. Energy dissipation index method for determining rockburst prevention drilling parameters[J]. Rock and Soil Mechanics, 2015, 36(8): 2 270-2 276. [7] 耿敏敏, 马占国, 龚鹏, 等. 高应力煤巷卸压孔布置方式对卸压效果影响分析[J]. 中国安全生产科学技术, 2012, 8(11): 5-10. GENG Minmin, MA Zhanguo, GONG Peng, et al. Analysis of the effect on pressure relief by the pressure relieving hole layouts in high stress coal roadway[J]. Journal of Safety Science and Technology, 2012, 8(11): 5-10. [8] 李跃文, 刘赛, 曹安业, 等. 卸压钻孔对巷道煤体卸压效应的数值分析及应用[J]. 煤炭工程, 2016, 48(11): 50-53. LI Yuewen, LIU Sai, CAO Anye, et al. Numerical analysis and application of coal pressure relief effect with drillings in roadway[J]. Coal Engineering, 2016, 48(11): 50-53. [9] 马振乾, 姜耀东. 李彦伟, 等. 极软煤层巷道钻孔卸压与U型钢协同控制[J]. 煤炭学报, 2015, 40(10): 2 279-2 286. MA Zhenqian, JIANG Yaodong, LI Yanwei, et al. Collaborative control of pressure released boreholes with U-steel of roadways in ultra-soft coal seam[J]. Journal of China Coal Society, 2015, 40(10): 2 279-2 286. [10] 于斌, 陈蓥, 韩军, 等. 口泉断裂与同忻井田强矿压显现的关系[J]. 煤炭学报, 2013, 38(1): 73-77. YU Bin, CHEN Ying, HAN Jun, et al. Study of the relationship between the Kouquan fault and strong ground pressure in Tongxin coal mine[J]. Journal of China Coal Society, 2013, 38(1): 73-77. [11] 张寅. 强冲击危险矿井冲击地压灾害防治[M]. 北京:煤炭工业出版社,2010: 107-110. [12] 刘少虹. 动载冲击地压机理分析与防治实践[D]. 北京:煤炭科学研究总院, 2013. LIU Shaohong. The study on the mechanism and prevention of dynamic-loading rockburst[D]. Beijing: China Coal Research Institute, 2013. [13] 张宏伟, 李云鹏, 陈蓥, 等. 三硬条件下孤岛区域大直径钻孔防冲方案优化研究[J]. 安全与环境学报, 2017,17(5): 1 823-1 827. ZHANG Hongwei, LI Yunpeng, CHEN Ying, et al. Research on safety advancing speed of isolated workingface in rockburst coal mine with three hard condition[J]. Journal of Safety and Environment, 2017,17(5): 1 823-1 827. [14] 张宏伟, 李云鹏, 陈蓥, 等. 三硬条件下孤岛工作面安全推进速度研究[J]. 煤炭科学技术, 2017, 45(2): 6-11. ZHANG Hongwei, LI Yunpeng, CHEN Ying, et al. Research on safety advancing speed of isolated workingface in rockburst coal mine with three hard condition[J]. Coal Science and Technology, 2017, 45(2): 6-11. [15] BAO Xiaoyi, CHEN Liang. Recent progress in brillouin scattering based fiber sensors[J]. Sensors, 2011, 11(4): 4 152-4 187. [16] 张丹, 张平松, 施斌, 等. 采场覆岩变形与破坏的分布式光纤监测与分析[J]. 岩土工程学报, 2015, 37(5): 952-957. ZHANG Dan, ZHANG Pingsong, SHI Bin, et al. Monitoring and analysis of overburden deformation and failure using distributed fiber optic sensing[J]. Chinese Journal of Geotechnical Engineering, 2015, 37(5): 952-957. [17] 施斌, 徐洪钟, 张丹, 等. BOTDR应变监测技术应用在大型基础工程健康诊断中的可行性研究[J]. 岩石力学与工程学报, 2004, 23(3): 493-499. SHI Bin, XU Hongzhong, ZHANG Dan, et al. Feasibility study on application of BOTDR to health monitoring for large infrastructure engineering[J]. Chinese Journal of Rock Mechanics and Engineering, 2004, 23(3): 493-499. [18] 寇海磊, 张明义, 刘俊伟. 基于光纤传感技术静压桩承载力时间效应机理分析[J]. 岩土力学, 2013, 34(4): 1 082-1 088. KOU Hailei, ZHANG Mingyi, LIU Junwei. Bearing capacity efficiency mechanism analysis of jacked pile based on optical fiber sensing technology[J]. Rock and Soil Mechanics, 2013, 34(4): 1 082-1 088. [19] 魏广庆, 施斌, 余小奎, 等. BOTDR分布式检测技术在复杂地层钻孔灌注桩测试中的应用研究[J]. 工程地质学报, 2008, 16(6): 826-832. WEI Guangqing, SHI Bin, YU Xiaokui, et. al. BOTDR based distributed strain test on bored pile buried in complicated geological ground[J]. Journal of Engineering Geology, 2008, 16(6): 826-832. |