[1] |
吴中如.水工建筑物安全监控理论及其应用[M].北京:高等教育出版社,2003: 360-361.
|
[2] |
吴中如,卢有清.利用原型观测资料反馈大坝的安全监控指标[J].河海大学学报:自然科学版,1989,17(6): 29-36.WU Zhongru, LU Youqing. Feedback analysis of safety-monitoring values of dams with available in-situ measurements[J].Journal of Hohai University:Natural Sciences,1989,17(6): 29-36.
|
[3] |
顾冲时,吴中如,阳武.用结构分析法拟定混凝土坝变形三级监控指标[J].河海大学学报:自然科学版,2000,28(5): 7-10.GU Chongshi, WU Zhongru, YANG Wu. Determining grade three monitoring indicator of dam deformation with structural analysis method [J]. Journal of Hohai University:Natural Sciences,2000,28(5): 7-10.
|
[4] |
蒋清华,马福恒,刘成栋.碗窑碾压混凝土坝变形成因分析及监控指标的拟定[J].中国安全科学学报,2007,17(4): 172-176.JIANG Qinghua, MA Fuheng, LIU Chengdong. Cause analysis of deformation and determination of monitoring index for wanyao RCC dam [J]. China Safety Science Journal,2007,17(4): 172-176.
|
[5] |
雷鹏,肖峰,苏怀智.考虑区间影响因素的混凝土坝变形监控指标研究[J].水利水电技术,2011,42(6): 91-93.LEI Peng, XIAO Feng, SU Huaizhi. Study on concrete dam deformation monitoring and control index with consideration of interval influencing factors [J]. Water Resources and Hydropower Engineering,2011,42(6): 91-93.
|
[6] |
LEI Peng,CHANG Xiaolin,XIAO Feng, et al. Study on early warning index of spatial deformation for high concrete dam [J]. Science China Technological Sciences,2011,54(6): 1 607-1 614.
|
[7] |
苏怀智,王锋,刘红萍.基于POT模型建立大坝服役性态预警指标[J].水利学报,2012,43(8): 974-978.SU Huaizhi, WANG Feng, LIU Hongping. Early-warning index for dam service behavior based on POT model [J].Journal of Hydraulic Engineering,2012,43(8): 974-978.
|
[8] |
肖磊,万智勇,黄耀英,等.基于最大熵和云模型的RCC坝变形监控指标拟定[J].水利水运工程学报,2018(4): 24-29.XIAO Lei, WAN Zhiyong, HUANG Yaoying, et al. RCC dam deformation monitoring index based on maximum entropy and cloud model [J]. Hydro-Science and Engineering,2018(4): 24-29.
|
[9] |
蔡忍,黄耀英,万智勇,等.基于投影寻踪-云模型法的碾压混凝土坝综合变形监控指标拟定[J].武汉大学学报:工学版,2019,52(3): 194-200.CAI Ren, HUANG Yaoying, WAN Zhiyong, et al. Comprehensive deformation monitoring of RCC dams based on projection pursuit-cloud model method [J]. Engineering Journal of Wuhan University,2019,52(3): 194-200.
|
[10] |
SL252—2017,水利水电工程等级划分及洪水标准[S].SL252-2017,Standard for rank classification and flood projection criteria of water hydropower projects[S].
|
[11] |
谷艳昌,王士军,庞琼,等.基于风险管理的混凝土坝变形预警指标拟定研究[J].水利学报,2017,48(4): 480-487.GU Yanchang, WANG Shijun, PANG Qiong, et al. Study on early warning index of concrete dam's deformation based on the risk management [J]. Journal of Hydraulic Engineering,2017,48(4): 480-487.
|
[12] |
魏德荣,大坝安全监控指标的制定[J].大坝与安全,2003(6): 24-28.WEI Derong. On working out dam safety monitoring index [J]. Large Dam and Safety,2003(6): 24-28.
|
[13] |
沈珠江,左元明.堆石料的流变特性试验研究[C].第6届土力学基础工程学术会议论文集,1991: 443-446.
|
[14] |
周伟,常晓林,胡颖,等.高混凝土面板坝流变分析[J].武汉大学学报:工学版,2005,38(6): 96-99.ZHOU Wei, CHANG Xiaolin, HU Ying, et al. Creep analysis of high concrete face rockfill dam [J]. Engineering Journal of Wuhan University,2005,38(6): 96-99.
|
[15] |
鞠石泉.面板堆石坝坝体变形监控模型研究[D].南京:河海大学,2005.JU Shiquan. Study on the monitoring model of face rock-fill dam's deformation[D].Nanjing: Hohai University,2005.
|