[1] ICAO, 2013-2028 global air navigation plan. capacity and efficiency[R]. Doc 9750-AN/963, 2013. [2] Eurocontrol Experimental Centre. Point merge integration of arrival flows enabling extensive RNAV application and continuous descent-operational services and environment definition[R],2010. [3] GRIMAUD I, HOFFMAN E, ROGNIN L, et al. Spacing instructions in approach: a stepwise design[J]. Air Traffic Control Quarterly, 2005,3 (2):127-154. [4] BOURSIER L, FAVENNEC B, HOFFMAN E, et al. Merging arrival flows without heading instructions[C]. 7th USA/Europe Air Traffic Management R&D Seminar, 2007:1-8. [5] FAVENNEC B, HOFFMAN E, TRZMIEL A, et al. The point merge arrival flow integration technique: towards more complex environments and advanced continuous descent[C]. 9th AIAA Aviation Technology, Integration, and Operations Conference (ATIO), 2009:1-9. [6] IVANESCU D, SHAW C, TAMVACLIS C ,et al. Models of air traffic merging techniques: evaluating performance of point merge[C]. Proceeding of 9th AIAA Aviation Technology, Integration, and Operations Conference (ATIO) ,2009: 21-23. [7] Eurocontrol Experimental Centre. Point merge deployment status[EB/OL]. [2016-12-25]. http://www.eurocontrol.int/services/point-merge-concept. [8] 邹朝忠,杨波,黄卫芳. 融合点进近程序和技术浅析[J].空中交通管理,2010(1):9-12,30. ZOU Chaozhong , YANG Bo, HUAN Weifang. Merging point approach procedures and its technical analysis[J]. Air Traffic Management, 2010 (1):9-12,30. [9] 郝帅. 基于性能导航飞行程序的连续下降进近研究[D]. 广汉:中国民用航空飞行学院, 2012. HAO Shuai. The operation research of CDA based on PBN flight procedure[D].Guanghai:Civil Aviation Flight University of China, 2012. [10] 晁绵博, 赵向领, 李鹏程,等. 终端区点融合进近程序设计方法研究[J]. 航空计算技术, 2016, 46(2):10-14,18. CHAO Mianbo, ZHAO Xiangling, LI Pengcheng,et al. Research on point merge approach procedure design in terminal area[J]. Aeronautical Computing Technique, 2016, 46(2):10-14,18. [11] Eurocontrol Experimental Centre. Point merge in extended terminal area[R]. EEC Technical/Scientific Report No. 2010-011,2010. [12] 王超.飞行程序运行评估的理论与方法研究[M].北京:航空工业出版社, 2014:71-76. WANG Chao. Research on method and theory of flight procedure and operation assessment[M]. Beijing:Aviation Industry Press,2014:71-76. [13] 卢飞,张兆宁,魏志强,等.近距平行跑道配对进近纵向碰撞风险安全评估[J].中国安全科学学报,2013,23(8):108-113. LU Fei, ZHANG Zhaoning, WEI Zhiqiang, et al. The longitudinal collision risk safety assessment of closed spaced parallel runways paired approach [J]. China Safety Science Journal, 2013, 23(8): 108-113. [14] 卢飞, 朱楠, 杨斯,等. 近距平行跑道配对进近侧向碰撞风险评估[J]. 中国安全科学学报, 2016,26(11):87-92. LU Fei,ZHU Nan,YANG Si, et al. Assessment of lateral collision risk in closed spaced parallel runways paired approach[J]. China Safety Science Journal, 2016,26(11):87-92. [15] ICAO. Aircraft operations-volume 2 construction of visual and instrument flight procedures ed 6 [R]. DOC 8168 OPS Montréal, 2006. [16] 朱代武, 何光勤.目视和仪表飞行程序设计[M].成都:西南交通大学出版社,2004:26-31. ZHU Daiwu, HE Guangqin. Visual and instrument flight program design[M]. Chengdu:Southwest Jiaotong University Press,2004:26-31. |