China Safety Science Journal ›› 2022, Vol. 32 ›› Issue (S1): 103-107.doi: 10.16265/j.cnki.issn1003-3033.2022.S1.0143

• Safety engineering technology • Previous Articles     Next Articles

Operational risks and prevention of weather modification aircraft construction projects

ZHAI Wei1(), MA Jinyu1, GU Qingfeng1,**(), LI Hongyu2   

  1. 1 Institute for Development and Programme Design, China Meteorological Administration, Beijing 100081, China
    2 Weather Modification Center, China Meteorological Administration, Beijing 100081, China
  • Received:2022-01-12 Revised:2022-04-15 Online:2022-06-30 Published:2022-12-30
  • Contact: GU Qingfeng

Abstract:

In order to ensure safe and stable aircraft construction in weather modification projects, and improve project management, risk analysis was carried out by using risk probability matrix method. Firstly, risks were classfied from a perspective of project construction, and then, analysis and evaluation of operational and maintenance risks was carried out. Finally, concrete preventive measures were proposed from aspects of operational capability of aircraft management companies, operating environment, flight crew, and maintenance and air material support. The results show that the management and resource allocation ability of aircraft management companies are the main risk factors. It is necessary to strengthen scientific selection, and their supervision and management in the whole life cycle of projects.

Key words: weather modification project, aircraft construction program, operational risk, risk prevention measure, risk probability matrix