China Safety Science Journal ›› 2023, Vol. 33 ›› Issue (S2): 202-208.doi: 10.16265/j.cnki.issn1003-3033.2023.S2.0028

• Safety engineering technology • Previous Articles     Next Articles

Analysis of influencing factors of TBM penetration under ″full and half sections″

XU Bingnan1(), ZHAO Xinhe1, CHEN Liangwu2,**(), LI Kun2, ZHANG Wenyan2, XU Ruipeng2   

  1. 1 China Railway Engineering Equipment Group Co., Ltd., Zhengzhou Henan 450016, China
    2 China Railway Engineering Equipment Group Technical Service Co., Ltd., Zhengzhou Henan 450016, China
  • Received:2023-08-06 Revised:2023-11-09 Online:2023-12-30 Published:2024-06-30
  • Contact: CHEN Liangwu

Abstract:

In order to explore the variation characteristics of hard rock tunnel boring machine (TBM) penetration under different working conditions, taking the TBM excavation drainage corridor project of Jinyun Pumped Storage Power Station as an example, the construction technology of tunnel line intersection is analyzed. The force of TBM cutter is analyzed, the rock breaking model of single cutter is established, and the rock breaking process of cutter is explored by finite element analysis software. According to the actual excavation data, this paper analyzes the relationship between TBM excavation parameters and rock parameters under half-section-full-section conditions. The results show that under the condition of half-section tunneling, the penetration of TBM increases logarithmically with the increase of cutterhead thrust, and also increases logarithmically with the increase of cutterhead torque. Under the full section condition, the penetration of TBM shows an exponential function and a linear function growth trend with the increase of cutterhead thrust and cutterhead torque, respectively, and the growth rate is related to rock parameters.

Key words: half section and full section conditions, tunnel boring machine (TBM) penetration, rock parameters, tunneling parameters, regression analysis