China Safety Science Journal ›› 2024, Vol. 34 ›› Issue (S1): 8-13.doi: 10.16265/j.cnki.issn1003-3033.2024.S1.0005

• Safety social science and safety management • Previous Articles     Next Articles

Research on risk assessment and early warning of safety management in thermal power enterprises based on AHP

CHEN Cheng(), WANG Hua, LI Qiang   

  1. Shandong Shiheng Thermal Power Co., Ltd., CHN ENERGY Investment Group Co., Ltd, Feicheng Shandong 271621, China
  • Received:2024-03-25 Revised:2024-06-02 Online:2024-06-30 Published:2024-12-30

Abstract:

In order to verify the scientific rationality of the risk assessment database of safety management and early warning mechanism for thermal power enterprises and achieve the controllability of safety risks in thermal power enterprises, an indicator system of safety management risk assessment was constructed, and an evaluation model for safety management risks in thermal power enterprises was established. The AHP modeling was used to analyze and evaluate the indicator system and determine the safety management risk level and weights for thermal power enterprises. Early warning strategies for safety management in thermal power enterprises were proposed, and the reliability of the results was validated through examples. The results show that the risk assessment database of safety management can assess and warn of potential accident risks in advance and automatically provide control and corrective measures and plans, thereby eliminating accidents in their early stages, reducing the frequency of accidents, and improving the level of safety production management.

Key words: thermal power enterprise, safety management, risk assessment, analytic hierarchy process (AHP) modeling, early warning research

CLC Number: