[1] 陈炳祥.金洞隧道瓦斯煤系地层施工技术[J].铁道标准设计,2004(11):47-50. CHEN Bingxiang. Construction of Jindong tunnel at gas and coal stratum[J]. Railway Standard Design,2004(11):47-50. [2] 余祖佳,周森,胡涛,等.煤系地层瓦斯隧道安全揭煤施工技术研究[J].公路交通科技:应用技术版,2012 (12): 279-282. [3] 刘昌命.石门深孔揭煤全断面一次爆破[J].煤矿安全,1984,15(7):21-24,65. LIU Changming. One-time blasting of full-face coal uncovering in Shimen deep hole [J]. Safety in Coal Mines,1984,15(7):21-24,65. [4] 魏世义.石门短导硐法快速揭煤技术[J].煤矿安全, 2000,31(12):3-5. WEI Shiyi. Quick coal-openning technology by way of crosscut short pilot tunnels [J]. Safety in Coal Mines, 2000,31(12):3-5. [5] 李开言,家竹箐.高瓦斯隧道煤层深孔爆破技术[J].铁道工程学报, 2002,74(2):38-41. LI Kaiyan. Deep hole blasting technique in coal bed of Jiazhuqing high gas tunnel [J].Journal of Railway Engineering Society, 2002,74(2):38-41. [6] 孟贤正,汪长明,刘骏,等.上山石门微差控制排爆揭煤预防突出的试验研究[J]. 矿业安全与环保, 2004,31(2):13-15,23. MENG Xianzheng,WANG Changming,LIU Jun, et al. Experimental study on explosion elimination afecting mine gas explosion and outburst prevention with delay control during exposing coal seam in a rise crosscut [J]. Mining Safety and Environmental Protection, 2004,31(2):13-15,23. [7] 蔡峰,刘泽功,张朝举,等.高瓦斯低透气性煤层深孔预裂爆破增透数值模拟[J]. 煤炭学报, 2007,32(5):499-503. CAI Feng,LIU Zegong,ZHANG Chaoju, et al. Numerical simulation of improving permeability by deep-hole presplitting explosion in loose soft and low permeability coal seam [J]. Journal of China Coal Society, 2007,32(5):499-503. [8] 王智德,马祖遥.顺层岩质边坡爆破荷载作用下的损伤特性研究[J].中国安全科学学报,2018,28(11): 72-79. WANG Zhide, MA Zuyao. Research on damage characteristics of rock bedding under blasting load[J]. China Safety Science Journal, 2018,28(11): 72-79. [9] 陈鹏,郭金栋,李忠辉,等.高瓦斯低透气性煤层石门揭煤卸压爆破试验[J]. 煤炭科学技术, 2009,37(6):49-52. CHEN Peng,GUO Jindong,LI Zhonghui. Test on pressure released blasting applied to seam opening of cross-cut in high gassy and low permeability seam [J]. Coal Science and Technology, 2009,37(6):49-52. [10] 张春华,刘泽功,徐涛,等.石门对掘揭开急倾斜煤层突出与爆破增透消突技术[J]. 煤炭学报, 2010,35(1):85-88. ZHANG Chunhua, LIU Zegong, XU Tao, et al. Coal and gas outburst in steep inclined coal seam uncovered by two reverse drifts and technology of outburst elimination by increasing permeability with blasting [J]. Journal of China Coal Society, 2010,35(1):85-88. [11] 王小毛, 陈商强, 张道峰, 等. 突出矿井石门导硐震动炮揭煤的工程实践[J]. 煤炭技术, 2011,30(9):81-82. WANG Xiaomao, CHEN Shangqiang, ZAHNG Daofeng, et al.Application of pilot tunnel vibration shot to uncover coal in cross-cut of outburst mine [J]. Coal Technology, 2011,30(9):81-82. [12] SINGH P K, ROYM P S. Responses of roof and pillars of underground coal mines to vibration induced by adjacent open-pit blasting[J]. Environmental Geology, 2005,47(2): 205-214. [13] SINGH P K. Blast vibration damage to underground coal mines from adjacent open-pit blasting[J]. International Journal of Rock Mechanics and Mining Sciences, 2002,39(8): 959-973. [14] SINGH P K, ROY S K, SINHA A. A new blast damage index for the safety of underground coal mine openings[J]. Transactions of The Institutions of Mining and Metallurgy Section A-Mining Technology, 2003,112(2):A97-A104. [15] 刘波,肖红飞.隧道下伏溶洞顶板安全厚度确定方法[J]. 中国安全科学学报,2019,29(4): 104-111. LIU Bo,XIAO Hongfei. Method for determining safe thickness of cave roofs under a tunnel[J]. China Safety Science Journal, 2019,29(4): 104-111. [16] BAISHENG N, XIANGCHUN L. Mechanism research on coal and gas outburst during vibration blasting[J]. Safety Science, 2012,50(4): 741-744. [17] 俞启香.矿井瓦斯防治[M].徐州:中国矿业大学出版社,1992: 36-42. [18] 付国彬, 姜志方. 深井巷道矿山压力控制[M]. 徐州: 中国矿业大学出版社, 1996: 75-79. [19] TB10120—2002,铁路瓦斯隧道技术规范[S]. TB10120-2002, Technical code for railway tunnel with gas[S]. [20] ZHAO Jun, ZHANG Yong, RANJITH P G. Numerical simulation of blasting-induced fracture expansion in coal masses[J]. International Journal of Rock Mechanics and Mining Sciences, 2017,100: 28-39. [21] SOROUSH K, MEHDI Y, ARASH E. Trend analysis and comparison of basic parameters for tunnel blast design models[J]. International Journal of Mining Science and Technology, 2015,25(4): 595-599. [22] GB6722—2014,爆破安全规程[S]. GB6722-2014,Safety regulations for blasting [S]. |