频繁采动影响巷道围岩强化支护技术及其应用

李国盛1, 张辉1,2,3 副教授, 蒋帅旗1   

  1. 1 河南理工大学 能源科学与工程学院,河南 焦作 454003;
    2 河南省瓦斯地质与瓦斯治理重点实验室——省部共建国家重点实验室,河南 焦作 454000;
    3 煤炭安全生产河南省协同创新中心,河南 焦作 454000
  • 收稿日期:2018-04-13 修回日期:2018-06-20 出版日期:2018-07-28 发布日期:2020-11-25
  • 作者简介:李国盛(1992—),男,河南商丘人,硕士研究生,研究方向为煤矿巷道围岩支护及巷道底鼓防治。
  • 基金资助:
    河南省科技攻关项目(182102310005)。

Technology for enhancing supporting roadway surrounding rock influenced by frequent mining and its application

LI Guosheng1, ZHANG Hui1,2,3, JIANG Shuaiqi1   

  1. 1 School of Energy Science and Engineering,Henan Polytechnic University,Jiaozuo Henan 454003,China;
    2 The State Key Laboratory Cultivation Base for Gas Geology and Gas Control Henan Polytechnic University,Jiaozuo Henan 454000,China;
    3 Coal Production Safety Collaborative Innovation Center in Henan Province,Jiaozuo Henan 454000,China
  • Received:2018-04-13 Revised:2018-06-20 Online:2018-07-28 Published:2020-11-25

摘要: 为解决频繁采动导致巷道围岩支护效果差问题,提出了“锚杆锚索+浅深注浆”巷道围岩联合强化支护技术。该技术施工工艺包括清理表面浮矸、喷射混凝土封闭、注浆、刷巷、锚网支护及喷射混凝土,注浆设计方案包括浅孔注浆、深孔注浆及注浆封孔方案。通过力学分析和井下工程试验对围岩强化支护效果进行了分析。结果表明:利用“锚杆锚索+浅深注浆”联合强化支护技术,能固结围岩内的破碎煤岩体,降低巷道围岩内岩石破碎程度,提高固结性,有效的锚固锚杆锚索;巷道顶板离层量5天内变化量较小,而后逐渐趋于稳定。

关键词: 采动影响, 巷道围岩, 破碎体, 强化支护, 注浆区

Abstract: In order to solve the problem of poor surrounding rock support in the roadway influenced by frequent mining,a joint reinforcement technology of "bolt anchor + shallow deep grouting" was developed.The technology involves cleaning surface,floating raft,shotcrete closure,grouting,brushing lane,anchor net support and shotcrete.The grouting design includes shallow hole grouting,deep hole grouting and grouting sealing schemes.The effect of the surrounding rock strengthening support technology was demonstrated by means of mechanical analysis and downhole engineering test.The results show that by using the joint reinforcement technology of "bolt anchor + shallow deep grouting",the broken coal rock masses in the surrounding rock are consolidated,the consolidation property is improved,and the anchor cables are anchored effectively,and that the amount of change of the roof from the layer is small during the period of 5 days,and then gradually tends to be stable.

Key words: mining impact, roadway surrounding rock, broken body, enhanced support, grouting area