[1] SITHAO. 基于模糊故障树和模糊逻辑系统的船桥碰撞安全性研究[D]. 上海:上海交通大学, 2015. SITHAO. Research on fuzzy fault tree and fuzzy logic system for safety assessment in ship bridge collision[D]. Shanghai: Shanghai Jiaotong University, 2015. [2] 向俊,朱现场,金允龙. 船舶大型化进程的促进因素与制约因素分析[J]. 上海船舶运输科学研究所学报,2014,37(1): 19-24. XIANG Jun, ZHU Xianchang, JIN Yunlong. Analysis of promotion and restriction factors in the process of the ship size growth[J]. Journal of Shanghai Ship and Shipping Research Institute, 2014, 37(1): 19-24. [3] 王礼立, 陈国虞,杨黎明. 船桥碰撞过程引发的冲击动力学论题[J]. 振动与冲击, 2015, 34(3): 14-22. WANG Lili, CHEN Guoyu, YANG Liming. Impact dynamics topics motivated by ship-bridge collision process[J]. Journal of Vibration and Shock,2015,34(3): 14-22 [4] WANG Lili, YANG Liming, HUANG Dejin, et al. An impact dynamics analysis on a new crashworthy device against ship-bridge collision[J]. International Journal of Impact Engineering, 2008, 35(8): 895-904. [5] 胡振彪,伏耀华,蔡文山, 等.超大型油船撞击的非线性动力学行为数值模拟[J]. 中国航海, 2016, 39(4): 81-86. HU Zhenbiao, FU Yaohua, CAI Wenshan, et al. Numerical simulation of nonlinear dynamic behaviors of VLCC collision[J]. Navigation of China, 2016,39(4): 81-86. [6] FAN Wei, YUAN Wancheng. Numerical simulation and analytical modeling of pile-supported structures subjected to ship collisions including soil-structure interaction[J]. Ocean Engineering, 2014, 91(11): 11-27. [7] MASTAGLIO L. Bridge bashing[J]. Civil Engineering-ASCE, 2014, 67: 38-40. [8] 戴彤宇.船桥碰撞及其风险分析[D]. 哈尔滨: 哈尔滨工程大学, 2003. DAI Tongyu. Ship impact against bridge and its risk assessment[D]. Harbin: Harbin Engineering University, 2003. [9] 桑凌志,毛喆, 张文娟,等. 基于航迹预测的实时船舶安全预警方法[J]. 中国安全科学学报, 2014, 24(8): 164-169. SANG Lingzhi, MAO Zhe, ZHANG Wenjuan, et al. A real-time ship safety early warning method based on trajectory prediction[J]. China Safety Science Journal, 2014, 24(8): 164-169. [10] 黄常海,胡甚平,高德毅, 等. 大桥船撞动态风险评估系统的设计与实现[J]. 中国安全科学学报2013,23(4): 120-126. HUANG Changhai, HU Shenping, GAO Deyi, et al. Design and realization of assessment system on dynamic risk of ship collision with bridge[J]. China Safety Science Journal 2013, 23(4): 120-126. [11] FERDOUS R, KHAN F, SADIQ R, et al. Analyzing system safety and risks under uncertainty using a Bow-tie diagram: an innovative approach[J]. Process Safety & Environmental Protection, 2013, 91(1/2): 1-18. [12] MAEKEN V B, EHLERS S, KHAN F. Delay risk analysis of ship sailing the northern sea route[J]. Ship Technology Research Schiffstechnik, 2015, 62(1): 26-35. [13] RUIJTER A D, GULDENMUND F. The Bow-tie method: a review[J]. Safety Science, 2016, 88: 211-218. |