[1] 洪伟. 电力发展十三五规划正式发布[N]. 青年报, 2016-11-08(A15). [2] 陈述, 余迪, 郑霞忠. 水电工程施工作业安全管理能力集对分析[J]. 中国安全生产科学技术, 2014, 10(12): 56-61. CHEN Shu, YU Di, ZHENG Xiazhong. Set pair analysis in safety management ability in construction operation of hydropower project[J]. Journal of Safety Science and Technology, 2014, 10(12): 56-61. [3] 王建平, 聂本武, 张丰宇,等.水利水电工程立体交叉作业安全管理执行传递机制设计[J]. 中国安全科学学报, 2014, 24(6): 116-122. WANG Jianping, NIE Benwu, ZHANG Fengyu, et al.Transmission mechanism design for grade cross operations safety management execution in hydraulic and hydroelectric project[J]. China Safety Science Journal, 2014, 24(6): 116-122. [4] 孙长英. 水电项目风险管理评价研究[D]. 北京:华北电力大学, 2010. SUN Changying. Research on the risk of evaluation in hydropower project management[D].Beijing: North China Electric Power University, 2010. [5] MUSTAFA M A, AL-BAHAR J F. Project risk assessment using the analytic hierarchy process[J]. IEEE Transactions on Engineering Management, 1991, 38(1): 46-52. [6] 李百胜, 戚蓝. 国际 BOT 水电项目风险分析与评价[J]. 水利发展研究, 2002, 2(7): 15-17. LI Baisheng, QI Lan. International BOT hydropower project risk analysis and evaluation[J]. Water Resources Development Research, 2002, 2(7): 15-17. [7] 李芬花, 纪昌明, 刘元, 等. 基于层次分析法的水利水电工程 A.D.HALL 系统风险评估方法研究[J]. 水利水电技术, 2010, 41(3): 50-52. LI Fenhua, JI Changming, LIU Yuan, et al. Study on AHP-based risk assessment method of A D HALL system for water resources and hydropower project[J].Water Resources and Hydropower Engineering, 2010, 41(3): 50-52. [8] 江新, 赵静. 工程项目群的 AHP-NET 风险评价模型[J]. 中国安全科学学报, 2012, 22(10): 158-163. JIANG Xin, ZHAO Jing. Study on AHP-NET risk evaluation model of construction programme[J]. China Safety Science Journal, 2012, 22(10): 158-163. [9] 郑霞忠, 谌巧玲, 陈述, 等. 基于粗糙集的水电工程施工安全评价方法[J]. 中国安全科学学报, 2011, 21(1): 82-86. ZHENG Xiazhong, CHEN Qiaoling, CHEN Shu, et al. Safety assessment method for hydropower construction based on rough set[J]. China Safety Science Journal, 2011, 21(1): 82-86. [10] 郑霞忠, 邵波, 陈玲, 等. 基于Euclid理论的水电工程施工安全熵评价[J]. 中国安全科学学报, 2014, 24(6): 38-43. ZHENG Xiazhong, SHAO Bo, CHEN Ling, et al. Safety entropy evaluation of hydropower construction based on Euclid theory[J]. China Safety Science Journal, 2014, 24(6): 38-43. [11] GB/T 50927—2013, 大中型水电工程建设风险管理规范[S]. GB/T 50927-2013, Code for risk management for large and medium scale hydropower projects[S]. [12] DL/T 5274—2012, 水电水利工程施工重大危险源辨识及评价导则[S]. DL/T 5274-2012, Guide for major hazard of identification and assessment of hydropower and water resources construction[S]. [13] HALL A D. Three-dimensional morphology of systems engineering[J]. IEEE Transactions on Systems Science and Cybernetics, 1969, 5(2): 156-160. [14] 马文·拉桑德[挪威]. 风险评估理论、方法与应用[M]. 刘一骝, 译. 北京: 清华大学出版社, 2013: 3-10. MARVIN R. Risk assessment theory, methods, and application[M]. LIU Yiliu, Translated. Beijing: Tsinghua University Press, 2013: 3-10. [15] JI Changming, LI Fenhua, XING Jian, et al. Notice of retraction research on the water conservancy and hydropower system engineering based on A.D.HALL theory[C].Asia-Pacific Power and Energy Engineering Conference, 2010: 1-3. [16] 孟碟. 水利水电工程标段划分模型研究[J]. 贵州水力发电, 2011, 25(4): 74-76. MENG Die. Study on section partition model of water resources and hydropower engineering[J]. Guizhou Water Power, 2011, 25(4): 74-76. [17] GB/T 7027—2013,信息分类和编码的基本原则与方法[S]. GB/T 7027-2013,Basic principles and methods for information classifying and coding[S]. |