中国安全科学学报 ›› 2025, Vol. 35 ›› Issue (S2): 80-86.doi: 10.16265/j.cnki.issn1003-3033.2025.S2.0014

• 安全工程技术 • 上一篇    下一篇

中型中层岩质牵引式滑坡治理工程适应性分析

谢志远1(), 龚强1, 葛程1, 胡益铭2, 袁云星2,**()   

  1. 1 四川省地质矿产(集团)有限公司, 四川 成都 610036
    2 中安国泰(北京)科技发展有限公司, 北京 102209
  • 收稿日期:2025-06-10 出版日期:2026-02-04
  • 通信作者:
    **袁云星(1990—),男,宁夏固原人,硕士,工程师,主要从事边坡地质、监测预警等方面的工作。E-mail:
  • 作者简介:

    谢志远 (1977—),男,重庆人,本科,高级工程师,主要从事矿山勘查,工程勘察,灾害治理,矿山管理技术等方面的工作。E-mail:

    龚强 工程师

    葛程 工程师

    袁云星 工程师

Adaptability analysis of treatment project for medium-sized middle-level rock-mass traction landslide

XIE Zhiyuan1(), GONG Qiang1, GE Cheng1, HU Yiming2, YUAN Yunxing2,**()   

  1. 1 Sichuan Geological and Mineral Resources Group Co., Ltd., Chengdu Sichuan 610036, China
    2 Cathay Safety Technology Co., Ltd., Beijing 102209, China
  • Received:2025-06-10 Published:2026-02-04

摘要:

为解决传统矿山滑坡治理工程评价中多侧重于技术经济指标,而缺乏对安全、环境、社会等多维度因素系统整合的问题,以四川省德昌县某矿采场北侧中型中层岩质牵引式滑坡为对象,开展治理工程适应性分析研究。通过系统剖析滑坡地质特征与成因机制,构建涵盖安全可靠性、经济合理性、技术可行性、环境适应性及社会适应性5个维度的综合评价指标体系;在此基础上,综合运用层次分析法(AHP)与模糊综合评价法,分别从指标权重确定与隶属度计算2方面定量评估治理工程。结果表明:模糊综合评价得分为3.276,表明工程整体重要性介于“较重要”与“重要”之间;AHP计算得出治理工程适应性指数为2.135,依据分级标准属于“适应性较好”等级;该治理方案在结构安全、投资控制与技术实施方面表现良好,同时在生态恢复、施工干扰控制及社会效益方面也具有显著优势。

关键词: 牵引式滑坡, 滑坡治理工程, 适应性分析, 层次分析法(AHP), 模糊综合评价法

Abstract:

To address the issue that evaluations for traditional mine landslide treatment projects often emphasize technical and economic indicators while lacking systematic integration of multidimensional factors such as safety, environment, and society, an adaptability analysis of treatment projects was conducted using a medium-sized middle-level rock-mass traction landslide on the northern side of a mining area in Dechang County of Sichuan Province as the case study. Through systematic analysis of the landslide's geological characteristics and causative mechanisms, a comprehensive evaluation indicator system was constructed, encompassing five dimensions: safety reliability, economic rationality, technical feasibility, environmental adaptability, and social adaptability. On this basis, the AHP and fuzzy comprehensive evaluation method were integrated to quantitatively assess the treatment project from two aspects: indicator weight determination and membership degree calculation. The results indicate that the fuzzy comprehensive evaluation score of 3.276 places the project's overall importance between ″relatively important″ and ″important″. The adaptation indicator calculated by AHP is 2.135, which is classified as ″relatively well-adapted″ according to grading standards. This treatment plan demonstrates strong performance in structural safety, investment control, and technical implementation, and exhibits significant advantages in ecological restoration, construction disturbance control, and social benefits.

Key words: traction landslide, landslide treatment project, adaptability analysis, analytic hierarchy process (AHP), fuzzy comprehensive evaluation method

中图分类号: