[1] 郑之寿,胡剑,宫爱成,等.辽宁红沿河核电厂RRI/SEC换热系统防低温设计[C]. 全国反应堆热工流体会议,2007: 90-95. [2] 李恒.核电厂设备冷却水系统调试研究[J].核动力工程,2015,36(增1): 166-169. LI Heng. Study on commission of equipment cooling water system in nuclear power plants[J].Nuclear Power Engineering,2015,36(S1): 166-169. [3] 赵嘉明. 核动力装置一回路水锤研究及仿真计算[D]. 哈尔滨:哈尔滨工程大学,2008. ZHAO Jiaming. Study of water hammer and simulation of nuclear power plants primary system[D]. Harbin: Harbin Engineering University, 2008. [4] 张慧贤, 寇子明, 陆春月, 等. 主动液压激波作用下管道振动控制的运动分析与试验研究[J]. 机械工程学报,2012,48(6):149-156. ZHANG Huixian, KOU Ziming, LU Chunyue, et al. Kinematic analysis and experimental research of pipe vibration control based on active hydraulic excitation force[J]. Journal of Mechanical Engineering, 2012,48(6): 149-156. [5] 杨春敏, 张景松. 水锤及水锤压力波在水系中传播的分析与试验[J]. 流体机械, 2014,42(9): 10-12. YANG Chunmin, ZHANG Jingsong. Apparatus inducing water-hammer and the analysis and experiment of the water-hammer pressure wave propagation in the water system[J]. Fluid Machinery, 2014,42(9): 10-12. [6] 王 鑫, 韩伟时. 压水堆核电厂主给水管道水锤计算及分析[J]. 原子能科学技术,2010,44(增1): 192-197. WANG Xin, HAN Weishi.Water hammer calculation and analysis in main feedwater system of PWR nuclear power plants[J]. Atomic Energy Science and Technology, 2010,44(S1): 192-197. [7] 盛美玲, 田卫卫, 邱锦萌, 等. 非能动先进核电厂主给水管道水锤模拟计算[J]. 原子能科学技术,2015,49(增1): 200-204. SHENG Meiling, TIAN Weiwei, QIU Jinmeng, et al. Simulation and calculation of water hammer to main feedwater line in passive advanced nuclear power plant[J]. Atomic Energy Science and Technology, 2015,49(S1): 200-204. [8] 胡志敏, 王 苇, 孟海波. 核动力装置二回路给水系统水锤动态计算分析[J]. 船海工程,2007,36(3): 90-93. HU Zhimin, WANG Wei, MENG Haibo. Dynamic analysis of water hammer to feedwater system of the nuclear power plant[J]. Ship & Ocean Engineering, 2007,36(3): 90-93. [9] 韩文伟, 韩伟实, 郭清, 等. 旋启式止回阀关阀水锤优化分析[J]. 原子能科学技术, 2014,48(5): 854-860. HAN Wenwei, HAN Weishi, GUO Qing, et al. Optimization analysis of swing check valve closing induced water hammer[J]. Atomic Energy Science and Technology, 2014,48(5): 854-860. [10] 刘志勇, 刘光临, 苏锋杰. 压水堆核电厂三回路停泵水锤数值模拟[J]. 核动力工程, 2005,26(5): 502-505. LIU Zhiyong, LIU Guanglin, SU Fengjie. Numerical simulation of pump-stopping water hammer in tertiary circulating water system of PWR nuclear power plant[J]. Nuclear Power Engineering, 2005,26(5): 502-505.
|