[1] |
LONG Tengteng, YIN Jiyan, OU Zhaorong, YANG Qiang, LI Yong, WANG Qiuhua.
Comprehensive assessment and spatial pattern study on forest fire risk in Yunnan Province
[J]. China Safety Science Journal, 2021, 31(9): 167-173.
|
[2] |
HU Yunpin, LI Chao, LI Zongliang, YANG Daohe.
IHFACS-BN safety assessment model for large-span steel structure construction and its application
[J]. China Safety Science Journal, 2021, 31(8): 147-154.
|
[3] |
WANG Junwu, WANG Mengyu, LIU Denghui, WU Han, HU Die.
Evaluation of falling possibility at height in subway station construction based on HFACS-BN
[J]. China Safety Science Journal, 2021, 31(6): 90-98.
|
[4] |
WU Haitao, LI Shuangxi.
High-speed railway emergency dispatching safety analysis based on STAMP/STPA
[J]. China Safety Science Journal, 2021, 31(6): 113-120.
|
[5] |
JIA Fei, MENG Xuelei, JIA Baotong, LI Tao, ZHANG Yang.
Research on passenger flow assignment for high-speed railwayunder public health emergencies
[J]. China Safety Science Journal, 2021, 31(6): 153-160.
|
[6] |
AN Yu, LI Ziqi, WANG Hui, GUO Zimeng, ZHANG Jiangbonan.
Risk assessment on unsafe behaviors of university laboratories based on FBN
[J]. China Safety Science Journal, 2021, 31(5): 160-167.
|
[7] |
DONG Lei, LIU Jiachen, ZHAO Changxiao, DANG Xiangjun, SHI Chunlei.
Airworthiness compliance verification technology of human factors in touch display system
[J]. China Safety Science Journal, 2021, 31(2): 63-68.
|
[8] |
REN Yumou, ZHANG Qi, YUAN Zhiming, SUN Yanhao.
Research on optimization for utilization of arrival and departure tracks at high-speed railway station under condition of safety constraints
[J]. China Safety Science Journal, 2021, 31(1): 179-185.
|
[9] |
ZHANG Chaorong.
Discussion on legislation of UAV safety management along high-speed railway
[J]. China Safety Science Journal, 2020, 30(S1): 38-42.
|
[10] |
LONG Shidan.
Application of automatic operation system for high-speed railway
[J]. China Safety Science Journal, 2020, 30(S1): 92-97.
|
[11] |
YANG Xiaoli, LIU Xiangdong.
Discussion on problems existing in completion acceptance of high-speed railway project
[J]. China Safety Science Journal, 2020, 30(S1): 146-151.
|
[12] |
YOU Bo, LIU Jianfeng, SHI Shiliang, LIU Heqing, LU Yi, ZHANG Mengdi.
Experimental study on influence of harsh environment of deep well on safety human factor indexes
[J]. China Safety Science Journal, 2020, 30(12): 52-61.
|
[13] |
LI Na, ZHANG Yan, HUA Yudong, ZHANG Peihong.
Impact of external wind field on spread of luggage fire in high-speed rail carriage
[J]. China Safety Science Journal, 2020, 30(12): 141-147.
|
[14] |
YE Gui, YUE Hongzhe, FENG Xinyi, LI Yuanli, CHEN Liying.
Simulation study on causes of cognitive failure of construction workers' unsafe behavior
[J]. China Safety Science Journal, 2020, 30(11): 6-12.
|
[15] |
ZHONG Qingwei, ZHANG Yongxiang, WEN Chao, PENG Qiyuan, WANG Mengmeng.
Optimized decomposition algorithm for train-set scheduling of high-speed railway network
[J]. China Safety Science Journal, 2019, 29(S2): 10-17.
|