[1] 刘萍,程晓卿,秦勇,等. 基于模糊故障树的塞拉门系统可靠性分析[J]. 中南大学学报:自然科学版,2013,44(1): 310-314. LIU Ping,CHENG Xiaoqing,QIN Yong,et al. Sliding plug door system reliability analysis based on fuzzy fault tree[J]. Journal of Central University:Science and Technology,2013,44(1): 310-314. [2] 蔡国强,周莉茗,李熙,等. 基于GO法的城市轨道交通车门系统可靠性分析[J]. 西南交通大学学报,2011,46(2): 264-270. CAI Guoqiang,ZHOU Liming,LI Xi,et al. Reliability analysis of urban rail transit vehicle's door system based on GO method[J]. Journal of Southwest Jiangtong University,2011,46(2): 264-270. [3] 沈碧波,佘维,叶阳东,等. 一种基于TC-CPN的城轨列车门故障溯因诊断方法[J]. 铁道学报,2016,38(4): 51-58. SHEN Bibo,SHE Wei,YE Yangdong,et al. An abductive diagnosis method for urban rail train door faults based on cyber Petri net of time constraint[J]. Journal of the China Railway Society,2016,38(4): 51-58. [4] SHI Huichao,TIAN Long,WANG Liang. Bayesian diagnostic network model for sliding plug door[J]. Advanced Materials Research,2011,219/220: 1 496-1 499. [5] 朱江洪,李延来. 基于区间二元语义与FMEA的地铁车门故障风险评估[J]. 计算机集成制造系统,2019,25(7): 1 630-1 638. ZHU Jianghong,LI Yanlai. Risk assessment of metro door fault based on interval-valued 2-tuple linguistic and FMEA[J]. Computer Integrated Manufacturing Systems,2019,25(7): 1 630-1 638. [6] 李磊,施继忠,张小强. 地铁车辆故障模式危害度评估方法研究[J]. 中国安全科学学报,2018,28(5): 43-48. LI Lei,SHI Jizhong,ZHANG Xiaoqiang. Research on method of evaluating harmfulness of metro vehicle failure mode[J]. China Safety Science Journal,2018,28(5): 43-48. [7] 朱江洪, 李国芳, 王睿,等. 地铁列车非正常停车FMEA风险评估[J]. 中国安全科学学报, 2017, 27(2): 145-150. ZHU Jianghong,LI Guofang,WANG Rui,et al. FMEA based assessment of risk that metro train stops abnormally[J]. China Safety Science Journal,2017,27(2): 145-150. [8] CHENG Xiaoqing,XING Zongyi,QIN Yong,et al. Reliability analysis of metro door system based on FMECA[J]. Journal of Intelligent Learning Systems & Applications,2014,5(4): 216-220. [9] LU Bihong,HUA Peng,FU Zhenliang,et al. Case study on FMECA and risk assessment for the door system in high speed train[J]. Advanced Materials Research,2013,657: 2 335-2 339. [10] KINNEY G F,WIRUTH A D. Practical risk analysis for safety management[R]. Final Report Naval Weapons Center,1976. [11] WANG Weizhong,LIU Xinwang,QIN Yong. A fuzzy Fine-Kinney-based risk evaluation approach with extended MULTIMOORA method based on Choquet integral[J]. Computers & Industrial Engineering,2018,125: 111-123. [12] GUL M,GUVEN B,GUNERI A F. A new Fine-Kinney-based risk assessment framework using FAHP-FVIKOR incorporation [J]. Journal of Loss Prevention in the Process Industries,2018,53: 3-16. [13] GUL M,FATIH AK M,GUNERI A F. Occupational health and safety risk assessment in hospitals a case study using two-stage fuzzy multi-criteria approach[J]. Human and Ecological Risk assessment an International Journal,2017,23(2): 187-202. [14] KOKANGUL A, POLAT U,DAGSUYU C. A new approximation for risk assessment using the AHP and Fine Kinney methodologies[J]. Safety Science,2017,91: 24-32. [15] ONISAWA T, SUGENO M, NISHIWAKI Y, et al. Fuzzy measure analysis of public attitude towards the use of nuclear energy[J]. Fuzzy Sets & Systems, 1986, 20(3): 259-289. [16] GOMES L,LIMA M. TODIM basics and application to multicriteria ranking of projects with environmental impacts[J]. Foundations Computing and Decision Sciences,1992,16: 113-127. [17] ZHANG Huimin. Some interval-valued 2-tuple linguistic aggregation operators and application in multi-attribute group decision making[J]. Applied Mathematical Modelling,2013,37(6): 4 269-4 282. [18] JOSHI D, KUMAR S. Interval-valued intuitionistic hesitant fuzzy Choquet integral based TOPSIS method for multi-criteria group decision making[J]. European Journal of Operational Research, 2016, 248(1): 183-191. [19] 王应明. 运用离差最大化方法进行多指标决策与排序[J]. 系统工程与电子技术, 1998(7): 24-26. WANG Yingming. Using the method of maximizing deviations to make decision for multi-indicies[J]. Systems Engineering and Electronics,1998(7): 24-26. [20] LIU Huchen, YOU Jianxin, YOU Xiaoyue. Evaluating the risk of healthcare failure modes using interval 2-tuple hybrid weighted distance measure[J]. Computers & Industrial Engineering, 2014, 78: 249-258. |