[1] 卢春房.中国高速铁路工程质量管理创新与实践[J].中国铁道科学,2015,36(1): 1-10. LU Chunfang. Innovation and practice for engineering quality management of high speed railway in China [J]. China Railway Science, 2015,36(1): 1-10. [2] 邹俊辉.全面提升高速铁路建设质量的思考[J].高速铁路技术,2018,9(6): 91-94. ZOU Junhui. Reflection on improving quality of high-speed railway construction by creating a high quality demonstration line [J]. High- Speed Railway Technology, 2018,9(6): 91-94. [3] 蔡信伟. 高速铁路架梁施工中的安全管理要点[J]. 建设科技, 2017(16): 79-80. [4] ZAYED T, AMER M, PAN J. Assessing risk and uncertainty inherent in Chinese highway projects using AHP[J]. International Journal of Project Management, 2008, 26(4): 408-419. [5] 朱弘扬.浅谈高速铁路供电安全面临常见问题[J].科学与财富,2018(30):159. [6] 吴细水.树立严检慎修理念做好高速铁路工务维修管理[J].中国铁路,2014(11): 13-16. [7] 李竹君,毛宝华,苏梅,等.高速铁路列车ATP安全制动曲线优化设计[J].铁道学报,2018,40(4): 18-23. LI Zhujun, MAO Baohua, SU Mei, et al.Optimal design of safe braking curve of on-board ATP system in high-speed train [J]. Journal of the China Railway Society, 2018,40(4): 18-23. [8] FRANCESCO F, ANDREA G, NICOLA M. Quantitative security risk assessment and management for railway transportation infrastructures[C]. Critical Information Infrastructure Security, Third International Workshop, CRITIS 2008: 180-189. [9] 何华武.高速铁路运行安全检测监测与监控技术[J].中国铁路,2013(3): 1-7. [10] 唐强.上海铁路局高速铁路运营实践的探讨[J].铁道运输与经济,2018,40(9): 21-26. TANG Qiang. A tentative study on the high-speed railway operation practice of Shanghai railway [J]. Railway Transport and Economy, 2018,40(9): 21-26. [11] 卢春房.中国高速铁路建设项目一体化管理模式研究与实践[J].铁道学报,2016,38(11): 1-8. LU Chufang. Study and practice on integrated management model for High-speed railway construction projects in China[J]. Journal of the China Railway Society,2016,38(11): 1-8. [12] 高海涛,杨明宇,孟令云, 等.基于AHP—熵权的高速铁路行车安全风险研究[J].铁道运输与经济,2018,40(3): 85-90. GAO Haitao, YANG Mingyu, MENG Lingyun, et al. A study on High-speed railway safety risks based on AHP and entropy weight method [J]. Railway Transport and Economy, 2018,40(3): 85-90. [13] JO Hyun-Jeong,HWANG Jong-Gyu. Investigation of risk analysis methods for safety assurance in the train control system[C]. 2007 International Conference on Electrical Machines and Systems (ICEMS), 2007: 1 858-1 862. [14] 卢春房,周黎,张志方.中国高速铁路地震预警系统的研究与试验[J].科技导报,2016,34(18): 258-264. LU Chunfang, ZHOU Li, ZHANG Zhifang. Research and test on China high- speed railway earthquake early-warning system [J]. Science & Technology Review, 2016,34(18): 258-264. [15] 李晓宇,张鹏,戴贤春, 等.高速铁路自然灾害及异物侵限监测系统运用及管理优化研究[J].中国铁路,2013(10): 21-25. [16] 石锐华,李伟.高速铁路的灾害防护设计[J].铁道工程学报,2008(6):6-9,19. SHI Ruihua, LI Wei. The design of disaster prevention system for high-speed railway [J]. Journal of Railway Engineering Society, 2008(6):6-9,19. [17] REECE Clive F. IS-based warning system keeps business on track [OL]. (2019-08-29).http://www.esri.com. [18] 陈建.论铁道信号施工及配合施工重要部位卡控[J].低碳世界,2015(2): 258-259. [19] 马啸,韩宝明.高速铁路安全性影响因素分析及对策[J].铁道运输与经济,2018,40(4): 64-68. MA Xiao, HAN Baoming. Analysis and countermeasures of the factors affecting the safety of high-speed railway[J]. Railway Transport and Economy, 2018,40(4): 64-68. [20] 康高亮.中国高速铁路安全保障体系研究与实践[J].铁道学报,2017,39(11): 1-7. KANG Gaoliang. Research and practice on China's high speed railway safety guarantee system[J]. Journal of the China Railway Society, 2017,39(11): 1-7. |