China Safety Science Journal ›› 2025, Vol. 35 ›› Issue (S1): 21-28.doi: 10.16265/j.cnki.issn1003-3033.2025.S1.0004
• Safety social science and safety management • Previous Articles Next Articles
LIAO Guangdong1(
), YU Shilei2,3,**(
)
Received:2025-01-14
Revised:2025-03-18
Online:2025-09-02
Published:2025-12-30
Contact:
YU Shilei
CLC Number:
LIAO Guangdong, YU Shilei. Comprehensive prevention and control system for work safety in metallurgical enterprises based on risk quantitative evaluation[J]. China Safety Science Journal, 2025, 35(S1): 21-28.
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.cssjj.com.cn/EN/10.16265/j.cnki.issn1003-3033.2025.S1.0004
Table 1
Comparison of importance of achieving goal between criteria
| 比较准则 | 被比较准则 | 比值 |
|---|---|---|
| 管控措施未落实 | 风险未按期管控 | 2 |
| 管控措施未落实 | 存在未闭合隐患 | 1/4 |
| 管控措施未落实 | 隐患超期未整改 | 1/7 |
| 管控措施未落实 | 隐患整改不合格 | 1/9 |
| 管控措施未落实 | “三违”未处置 | 1/3 |
| 风险未按期管控 | 存在未闭合隐患 | 1/3 |
| 风险未按期管控 | 隐患超期未整改 | 1/5 |
| 风险未按期管控 | 隐患整改不合格 | 1/8 |
| 风险未按期管控 | “三违”未处置 | 1/2 |
| 存在未闭合隐患 | 隐患超期未整改 | 1/3 |
| 存在未闭合隐患 | 隐患整改不合格 | 1/5 |
| 存在未闭合隐患 | “三违”未处置 | 1/2 |
| 隐患超期未整改 | 隐患整改不合格 | 1/2 |
| 隐患超期未整改 | “三违”未处置 | 2 |
| 隐患整改不合格 | “三违”未处置 | 3 |
Table 2
Judgment matrix and weight of assessment index comparison
| 评价指标 | 措施未落实 | 未按期管控 | 未闭合隐患 | 超期未整改 | 整改不合格 | “三违”未处置 | 权重 | |
|---|---|---|---|---|---|---|---|---|
| 措施未落实 | 1 | 2 | 1/4 | 1/7 | 1/9 | 1/3 | 0.043 9 | |
| 未按期管控 | 1/2 | 1 | 1/3 | 1/5 | 1/8 | 1/2 | 0.042 2 | |
| 未闭合隐患 | 4 | 3 | 1 | 1/3 | 1/5 | 1/2 | 0.101 3 | |
| 超期未整改 | 7 | 5 | 3 | 1 | 1/2 | 2 | 0.256 2 | |
| 整改不合格 | 9 | 8 | 5 | 2 | 1 | 3 | 0.424 1 | |
| “三违”未处置 | 3 | 2 | 2 | 1/2 | 1/3 | 1 | 0.132 4 | |
| 合计 | 1.000 1 | |||||||
| 不一致系数 | 0.038 29 | |||||||
Table 3
Grid point scoring calculation rules
| 评价指标 | 等级 | 等级扣分值 对应关系 | 扣分值 |
|---|---|---|---|
| 风险管控 措施未落实 | 低风险 | ↔ | 0.5 |
| 一般风险 | ↔ | 1 | |
| 较大风险/ 重大风险 | ↔ | 3 | |
| 风险未按期 检查 | 低风险 | ↔ | 1 |
| 一般风险 | ↔ | 2 | |
| 较大风险/ 重大风险 | ↔ | 5 | |
| 存在未闭合 隐患 | 一般隐患 | ↔ | 5 |
| 重大隐患 | ↔ | 70 | |
| 隐患超期未 整改 | 一般隐患 | ↔ | 10 |
| 重大隐患 | ↔ | 90 | |
| 隐患整改 不合格 | 一般隐患 | ↔ | 20 |
| 重大隐患 | ↔ | 100 | |
| “三违” 未处置 | 一般“三违” | ↔ | 5 |
| 较重“三违” | ↔ | 20 | |
| 严重“三违” | ↔ | 50 | |
| 报警数据 | 一票否决,出现报警数据时,评分直接为0分 | ||
| [1] |
新质生产力驱动中国有色金属工业高质量发展[J]. 资源再生, 2024(10): 56-60.
|
|
New quality productivity drives high-quality development of China's non-ferrous metal industry[J]. Resource Recycling, 2024(10): 56-60.
|
|
| [2] |
王晓振, 于晓林, 王金良, 等. 铜冶炼企业安全风险管控方法分析[J]. 世界有色金属, 2024(24): 10-12.
|
| [3] |
余春青, 杨芳, 毋勇, 等. 石化企业大检修现场安全网格化监管方法[J]. 中国安全科学学报, 2022, 32(增1): 6-10.
|
|
doi: 10.16265/j.cnki.issn1003-3033.2022.S1.0350 |
|
| [4] |
国家安全生产监督管理总局, 国家煤矿安监局. 标本兼治遏制煤矿重特大事故工作实施方案[EB/OL].(2016-05-30). https://www.chinamine-safety.gov.cn/zfxxgk/fdzdgknr/tzgg/201605/t20160530_348971.shtm.
|
| [5] |
国务院安委会办公室. 关于实施遏制重特大事故工作指南构建双重预防机制的意见[EB/OL].(2016-10-11). https://www.mem.gov.cn/awhsy_3512/awhbgswj/201610/t20161011_247664.shtml.
|
| [6] |
国家煤矿安全监察局. 煤矿安全生产标准化管理体系基本要求及评分方法(试行)[EB/OL].(2024-11-01). https://www.chinamine-safety.gov.cn/zfxxgk/fdzdgknr/tzgg/202411/t20241101_508321.shtml.
|
| [7] |
郭立杰. 企业安全生产监管效能提升途径探讨[J]. 北京石油管理干部学院学报, 2022, 29(5): 43-46.
|
|
|
|
| [8] |
陈小林, 屈世甲, 佘九华, 等. 基于风险管控的煤矿安全综合防控体系[J]. 工矿自动化, 2021, 47(8): 15-19.
|
|
|
|
| [9] |
GB/T 33000—2016,企业安全生产标准化基本规范[S].
|
|
GB/T 33000-2016, Guideline of China occupational safety and health management system[S].
|
|
| [10] |
陈国华, 王新华. 基于I-PDCA的安全生产监管工作实施方法研究[J]. 中国安全科学学报, 2011, 21(8): 8-14.
|
|
|
|
| [11] |
宋张君. 发电企业风险管控4M屏障理论模型构建及其机制研究[J]. 中国安全科学学报, 2024, 34(增1): 1-7.
|
|
doi: 10.16265/j.cnki.issn1003-3033.2024.S1.0006 |
|
| [12] |
李爽, 贺超, 鹿乘, 等. 煤矿智能双重预防机制与智能安全管控平台研究[J]. 煤炭科学技术, 2023, 51(1): 464-473.
|
|
|
|
| [13] |
李爽, 贺超, 许锟. 煤矿安全双重预防机制理论、应用与发展研究[J]. 中国煤炭, 2021, 47(10): 23-30.
|
|
|
|
| [14] |
金洪伟, 于世雷, 徐刚, 等. 煤矿水害风险量化评价方法[J]. 中国安全生产科学技术, 2020, 16(4): 107-113.
|
|
|
|
| [15] |
刘小龙. 安全木桶原理在煤矿安全生产管理中的应用[J]. 湖北农机化, 2021(1): 87-88.
|
|
|
|
| [16] |
周毅, 张竞, 周宁, 等. 融入木桶原理的综合评估[J]. 计算机工程, 2006, 32(17): 197-199.
doi: 10.3969/j.issn.1000-3428.2006.17.069 |
|
doi: 10.3969/j.issn.1000-3428.2006.17.069 |
| [1] | WEI Mingyao, HUANGFU Haoqi, GAO Kang, LU Chunqin, YU Liyuan, FU Shigen. Quantitative evaluation of oil-type gas emission risk in mine with coal-oil-gas coexistence [J]. China Safety Science Journal, 2025, 35(4): 67-75. |
| [2] | WANG Feiyue, WANG Xinyu, ZHANG Wenjun, LIU Hui. Safety risk dynamic evaluation of fireworks production enterprises [J]. China Safety Science Journal, 2025, 35(3): 10-18. |
| [3] | ZHANG Hao, HAIMUDULA Aierken. Enterprise safety risk management model of machinery manufacturing industry based on improved YOLOv5 [J]. China Safety Science Journal, 2025, 35(3): 52-59. |
| [4] | JIN Jie, LIU Ya, WANG Fubao. Practice and analysis of safety risk control for chemical research and experimental equipment [J]. China Safety Science Journal, 2024, 34(S1): 122-128. |
| [5] | WANG Chen. Study on operation of safety management system in coal chemical enterprises [J]. China Safety Science Journal, 2024, 34(S1): 33-38. |
| [6] | LI Naiwen, CUI Linlin. Influence of personality traits on inattentional blindness and failure of safety risk perception:evidence from an eye-movement experiment [J]. China Safety Science Journal, 2024, 34(8): 11-17. |
| [7] | FENG Jiangping, ZHANG Jinfan, CHEN Feng, LIN Zehua, GUO Jianfeng, LIU Yong. Effect of 131I nuclide therapy operation mode correction on radiation safety risk [J]. China Safety Science Journal, 2024, 34(8): 231-237. |
| [8] | WANG Hongli, YANG Xingang. Safety risk dynamic assessment in university laboratories based on safety control structure model [J]. China Safety Science Journal, 2024, 34(8): 61-68. |
| [9] | LI Yike, ZHANG Honghai, SHI Zongbei, ZHOU Jinlun. Coupling mechanism of air traffic operation safety risk based on N-K-FRAM [J]. China Safety Science Journal, 2024, 34(5): 175-185. |
| [10] | ZHANG Jianshe, HUANG Yanlong, LI Hujun, CHEN Huihua, HE Kuang, DAI Zishuang. Study on coupling of subway shield tunneling safety risk based on improved N-K model [J]. China Safety Science Journal, 2024, 34(2): 67-75. |
| [11] | LIU Wei, DAI Ping, ZHAO Fanglei, CUI Kexin. Tourism safety risk assessment in mountainous scenic areas: a case study of Beijing [J]. China Safety Science Journal, 2024, 34(12): 168-177. |
| [12] | ZHANG Chao, WENG Wenguo, CHEN Yong, DAI Baoqian, QIN Tingxin. Characteristics of urban public safety risk and its enlightenment for risk management [J]. China Safety Science Journal, 2024, 34(1): 223-230. |
| [13] | SUN Diange. Research on the construction of civil airport safety management system based on digital twin technology [J]. China Safety Science Journal, 2023, 33(S1): 222-227. |
| [14] | WU Zhenzhen, YANG Wentao, WANG Xi, REN Xia. Research on assessment system of urban community safety development [J]. China Safety Science Journal, 2023, 33(S1): 249-255. |
| [15] | WANG Haiying, CHU Lin, XU Jian. Construction safety risk analysis of bridge girder-erecting machine based on complex network integrating N-K model [J]. China Safety Science Journal, 2023, 33(9): 10-17. |
| Viewed | ||||||
|
Full text |
|
|||||
|
Abstract |
|
|||||