中国安全科学学报 ›› 2022, Vol. 32 ›› Issue (S1): 57-62.doi: 10.16265/j.cnki.issn1003-3033.2022.S1.0980

• 安全社会科学与安全管理 • 上一篇    下一篇

基于Petri网模型的高铁沿线外部环境安全风险研究

王猛()   

  1. 国家铁路局 安全技术中心,北京 100160
  • 收稿日期:2022-02-12 修回日期:2022-05-16 出版日期:2022-06-30 发布日期:2022-12-30
  • 作者简介:

    王 猛 (1990—),男,辽宁营口人,硕士,工程师, 主要从事动车组车辆、高铁安全等方面的工作。E-mail:

  • 基金资助:
    国家铁路局安全技术中心科技项目(ZRGY-CCGP-19080111)

Study on safety risk of external environment along high-speed rail based on Petri net model

WANG Meng()   

  1. Safety Technology Center, National Railway Administration, Beijing 100160, China
  • Received:2022-02-12 Revised:2022-05-16 Online:2022-06-30 Published:2022-12-30

摘要:

为深入推进高铁沿线环境整治,有效防范高铁突发事件的发生,保障高铁安全稳定运行,分析研究高铁沿线外部环境安全风险。首先,基于高铁沿线外部环境突发事件,构建Petri网模型并计算模型参数;然后,基于模糊Petri网推理规则,计算各风险因素间的传导概率,评估各风险传递路径的风险值,甄别风险传递的关键路径,研究高铁沿线突发事件形成机制;最后,从周围类、自然因素类、施工类等方面分析高铁沿线外部环境安全风险的孕育源头。研究表明:高铁沿线突发事件安全风险源头主要包括人、周围物体、自然环境、施工单位等4个方面;行人的非法行为和施工单位的非法施工因素是高铁沿线突发事件形成的重要来源。

关键词: Petri网, 高铁沿线, 外部环境, 安全风险, 发生概率

Abstract:

In order to further promote environmental improvement along the high-speed rail, prevent the occurrence of high-speed rail emergencies effectively, and ensure safe and stable operation of high-speed rail, the safety risk of the external environment along high-speed rail was analyzed and studied. Firstly, the Petri net model was constructed, and parameters were calculated based on external environment emergencies along the high-speed rail. Then, based on reasoning rules of the fuzzy Petri net, the transmission probability among risk factors was calculated; risk value of each risk transmission path was evaluated; critical risk transmission paths were identified, and the formation mechanism of emergencies along high-speed rail was studied. Finally, breeding sources of safety risk of the external environment along high-speed rail were further analyzed from surroundings, natural factors, construction and other aspects. The research results show that the sources of safety risk of emergencies along high-speed rail mainly include people, surrounding objects, the environment and construction units. The illegal behaviors of pedestrians and illegal construction are important sources of emergencies along the high-speed rail.

Key words: Petri net, along high-speed rail, external environment, safety risk, probability of occurrence