[1] 中华人民共和国交通运输部. 2019年交通运输行业发展统计公报[Z].2020-05-12. [2] 熊建明.公路瓦斯隧道施工期安全管理与预警技术研究[D]. 北京:中国矿业大学(北京), 2016. XIONG Jianming. Study on the safety management and early warning technology during gas tunnel construction [D]. Beijing:China University of mining and Technology (Beijing), 2016. [3] 刘辉, 张智超, 王林娟. 2004—2008年我国隧道施工事故统计分析[J]. 中国安全科学学报,2010,20(1):96-100. LLU Hui, ZHANG Zhichao, WANG Linjuan. Statistical analysis of tunnel construction accidents in China from 2004 to 2008 [J]. China Safety Science Journal, 2010,20 (1): 96-100. [4] 郑艾辰, 黄锋, 林志, 等.2008年至2016年我国隧道工程施工安全事故统计与分析[J]. 施工技术,2017,46(增1): 833-836. ZHENG Aichen, HUANG Feng, LIN Zhi, et al. Statistics and analysis of tunnel construction safety accidents in China from 2008 to 2016 [J]. Construction Technology, 2017,46 (S1): 833-836. [5] 张军伟, 陈云尧, 陈拓, 等. 2006—2016年我国隧道施工事故发生规律与特征分析[J]. 现代隧道技术, 2018,55(3): 10-17. ZHANG Junwei, CHEN Yunyao, CHEN Tuo, et al. Law and characteristics analysis of domestic tunnel construction accidents from 2006 to 2016 [J]. Modern Tunnel Technology, 2018,55 (3): 10-17. [6] 杜志刚, 张小东, 王晓东. 基于属性数学理论的隧道瓦斯突出危险性评价[J]. 地下空间与工程学报, 2019,15(6): 1 866-1 873. DU Zhigang, ZHANG Xiaodong, WANG Xiaodong. Evaluation of tunnel gas outburst based on attribute mathematical theory [J]. Chinese Journal of Underground Space and Engineering, 2019,15 (6): 1 866-1 873. [7] 黄仁东, 张小军. 基于熵权物元可拓模型的隧道瓦斯等级评价[J]. 中国安全科学学报,2012,22(4): 77-82. HUANG Rendong, ZHANG Xiaojun. Evaluation of tunnel gas level based on entropy weight and matter element model [J].China Safety Science Journal, 2012,22 (4): 77-82. [8] 尹利平, 詹海光. 模糊集重心理论在隧道瓦斯突出评价中的应用[J]. 中国安全科学学报,2010,20(3): 151-155. YIN Liping, ZHAN Haiguang. Application of barycenter theory of fuzzy set to evaluation of tunnel gas outburst [J]. China Safety Science Journal, 2010,20 (3): 151-155. [9] 康小兵. 隧道工程瓦斯灾害危险性评价体系研究[D].成都:成都理工大学, 2009. KANG Xiaobing. Study on gas disaster risk assessment system of tunnel engineering [D]. Chengdu: Chengdu University of Technology, 2009. [10] 熊建明, 陈沅江, 刘波, 等.瓦斯隧道施工期风险等级的FDA法评价[J]. 重庆交通大学学报:自然科学版,2017,36(2): 17-23. XIONG Jianming, CHEN Yuanjiang, LIU Bo, et al. FDA method used in risk assessment of gas bearing tunnel during construction [J]. Journal of Chongqing Jiaotong University:Natural Science, 2017,36 (2): 17-23. [11] 高喜花. 基于不确定型层次分析法-理想点法的瓦斯隧道灾害危险性评价[J]. 公路交通科技:应用技术版,2016,12 (6): 245-246. [12] 康小兵, 许模. 我国瓦斯隧道建设现状综述[J]. 人民长江, 2011, 42(3): 30-33. KANG Xiaobing, XU Mo. Review of gas tunnel construction status in China [J]. Yangtze River, 2011, 42 (3): 30-33. [13] 《中国公路学报》编辑部. 中国隧道工程学术研究综述·2015 [J]. 中国公路学报,2015,28(5): 1-65. Editorial Department of China Journal of Highway and Transport. Review on China's tunnel engineering research: 2015 [J]. China Journal of Highway and Transport, 2015, 28 (5): 1-65. [14] 中华人民共和国应急管理部重大生产安全事故查处挂牌督办通知书[EB/OL]. (2020-08-19). https://www.mem.gov.cn/gk/sgcc/sggpdbqk/2020/202008/t20200829_357594.shtml. [15] 国家安全生产管总局. 生产安全事故报告和调查处理条例[L]. 2007- 06-01. |